What a solar carport is and who it suits
The permitted development order defines a solar canopy as "a canopy structure installed with solar PV or solar thermal equipment", open on all sides, or on three sides where it adjoins a building (GPDO Part 14). In practice it is a frame of steel columns and beams on foundations, with panels forming the roof.
- Staff car parks. Offices, factories and warehouses with parking used all day.
- Fleet and depot parking. Vans and vehicles that could charge on site.
- Customer car parks. Retail, hotels, leisure and garden centres with large open parking.
- Sites with a poor roof. An asbestos, fragile or ageing roof, or a listed building.
Carport or roof: which to look at first
| Roof system | Solar carport | |
|---|---|---|
| The structure | The roof you already have | A new steel structure and foundations |
| Cost per kW | Usually lower | Usually higher: steel, groundworks, drainage |
| Roof condition | Must be sound and strong enough | Doesn't matter |
| Shade and orientation | Fixed by the building | Laid out for the sun, within the car park |
| EV charging | Separate | Can be built in under the canopy |
| Disruption | Work at height, often while open | Bays closed while the car park is built |
Look at the roof first. If it is unsuitable, too small for what you use, or an asbestos cement roof you don't want to overclad, a carport is the next place to look.
Planning permission for solar carports
In England, Class OA of Part 14 allows a solar canopy in an area lawfully used as off-street parking, other than for a house or block of flats (GPDO Part 14). It is not permitted if:
- Height. Any part would be over 4 metres above ground level.
- Homes nearby. It would be within 10 metres of the curtilage of a house or block of flats.
- Heritage. It would be within the curtilage of a listed building, or on a scheduled monument.
- Advertising. It would be used to display an advertisement.
- Temporary car parks. The parking is a temporary use of land under Part 4, Class B.
Before starting, you apply to the council for a decision on whether its prior approval is needed for the canopy's siting, design and external appearance, in particular glare for neighbours. The work must be finished within 3 years of that decision. Over a permeable surface, run-off must go to a permeable or porous area within the car park, and when the canopy is no longer needed it must be removed and the land restored as far as reasonably practicable.
Outside those limits, or in Scotland, Wales or Northern Ireland, ask the installer or your planning adviser which rules apply.
Have a car park and no roof to spare? The survey looks at both.
Book a free site surveyAdding EV charging under the canopy
Chargers are a natural pairing: daytime solar, cars parked all day. Two things help with the cost:
- The Workplace Charging Scheme. Extended for a final year until 31 March 2027. Up to £500 per socket for installations completed on or after 1 April 2026, up to 75% of costs, and up to 40 sockets across all your sites. You apply for a voucher and an OZEV-authorised installer claims the grant for you (GOV.UK). It is open to businesses, charities and public sector organisations (GOV.UK).
- Capital allowances. New and unused EV charging equipment bought before April 2027 qualifies for 100% first-year allowances (GOV.UK), and the panels are special rate plant (HMRC). See capital allowances.
Chargers change the electrical design and the grid application, so mention them at the survey even if they come later. A battery can hold daytime solar for charging later in the day.
What the survey checks in a car park
- Lawful use and boundaries. That the area is lawfully used as off-street parking, and how far the nearest homes and gardens are.
- What is under the tarmac. Drainage runs, lighting cables, ducts and other buried services, before any foundation design.
- Levels and drainage. Falls, gullies and where water collects now; run-off rules over permeable surfaces.
- How the car park is used. Bay layout, vehicle heights (vans, deliveries, emergency access), lighting, CCTV and barriers.
- The supply and the grid. The distance to the main switchboard, and a G99 application to the network operator for systems over 16A per phase (NGED).
- Keeping the site open. Which bays close and when, and how deliveries and staff parking carry on.
Costs and payback: how to compare quotes
We don't publish carport prices: most of the cost is the structure, foundations and groundworks, which depend on the ground and the buried services, and we have no source we would stand behind. Compare quotes on the price per kWp, the expected yearly generation, how much of it you will use, what the price includes (groundworks, drainage, lighting under the canopy, chargers) and the warranties on the structure as well as the panels. Our payback guide explains why how much you use on site matters most.
Sources
legislation.gov.uk, GOV.UK, HMRC and network operator pages read on 2 November 2026. The Workplace Charging Scheme ends on 31 March 2027.
- legislation.gov.uk: GPDO 2015, Schedule 2, Part 14, Class OA (solar canopies on non-domestic off-street parking)
- GOV.UK: Workplace Charging Scheme, guidance for installers (updated 1 Apr 2026)
- GOV.UK: Government grants for low-emission vehicles
- GOV.UK: 100% first-year allowances (EV charging points bought before April 2027)
- HMRC CA22335: solar panels are special rate expenditure
- National Grid Electricity Distribution: G99 (over 16A per phase)