Commercial Battery Storage: When It Adds Value to Your Solar

A battery stores solar output your business can't use at the time and gives it back later. It is worth it when you export a lot by day and buy a lot in the evening or overnight, or when the grid limits what you can export. On the figures in our payback examples, a unit used on site saves 28.6p and a unit exported earns 4.1p: the gap is what a battery works with.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

Book a free site survey

Does my business need a battery with solar?

When a battery tends to add value, and when it doesn't
Adds value whenAdds little when
The panels often make more than the site is usingThe site uses nearly all its solar as it is made
You use a lot of power in the evening or overnightMost of your use is in the middle of the day
The grid limits what you can exportThe network can take everything you export
Your tariff charges more at peak timesYou pay a flat rate at all times
You plan EV charging after darkVehicles charge in the day, from the panels

A hotel, pub, care home or farm that works into the evening fits the left-hand column more often than an office that shuts at 5pm. The installer tells you which applies from your own data.

How a battery uses your half-hourly data

Half-hourly data shows what the site uses in every half hour of the year. Lay the solar system's expected output over it and two things appear: the surplus the panels make that the site doesn't use, and the demand after the sun goes down. A battery is sized to move one into the other.

Each unit moved is worth the gap between what you pay and what you would earn exporting it, less what is lost charging and discharging. DESNZ's figure for a small business in the second quarter of 2026 was 28.6p per kWh including the Climate Change Levy (DESNZ); export rates are set by suppliers and must be above zero (Ofgem), and our examples use 4.1p. Ask your supplier for 12 months of half-hourly data before the survey.

Find out whether a battery would earn its keep on your site: book a free survey.

Book a free site survey

Peak shaving and capacity charges

"Peak shaving" means using the battery to cut the site's demand at its most expensive or highest moments. Whether it saves you money depends entirely on how your supply is charged:

  • Time-of-day rates. If units cost more in some periods, a battery charged from solar or cheaper periods can cover them.
  • Charges for maximum demand or capacity. If part of your bill depends on your highest demand or an agreed capacity, a battery can lower the peaks it is measured on.
  • A flat rate. Peak shaving does nothing on a single unit price.

Check your bill, or ask your supplier, which of these applies before you count on it. We don't publish battery savings: they depend on the tariff and the site.

Batteries and export limits

Most business systems are above 16A per phase, so they need the network operator's approval under G99 before connecting (NGED; smaller ones notify under G98, NGED). NGED's G99 forms cover electricity storage alongside generating equipment, so the battery goes in the same application. Where the network can't take everything the system could export, the installer may propose limiting export. A battery can then store what would otherwise be wasted, which can make a larger solar system worthwhile. See commercial solar system sizes.

Fire safety and where a battery can go

If you control business premises you are the "responsible person" for fire safety, and must carry out a fire risk assessment and review it regularly (GOV.UK). A battery is a change to the premises, so:

  • Ask where and why. The installer should explain the proposed location, ventilation, separation from escape routes and how it is isolated.
  • Update the fire risk assessment. Tell whoever carries it out before the battery goes in.
  • Tell your insurer. Some insurers have their own requirements for batteries and solar; ask before you sign.
  • Plan for access. Who can reach the isolators in an emergency, and what signage the site needs.

Adding a battery later, and tax

Many businesses fit solar first and add a battery once they can see their real export pattern. If you might, say so at the survey: the inverter, switchgear, wall space and the grid application can allow for it, which is cheaper than changing them later. Adding storage later may need the network operator's agreement again.

On tax, HMRC's guidance designates solar panels as special rate plant but doesn't mention batteries (CA22335), so ask your accountant how a battery is treated. See capital allowances on solar panels.

Sources

DESNZ, Ofgem, network operator, GOV.UK and HMRC pages read on 2 November 2026; the 28.6p and 4.1p figures are the ones taken on 23 October 2026 for our payback calculator.

How we choose your installer

  1. 1We talk to you about the site and how the business uses electricity.
  2. 2Installers who cover your area see the project without your name or contact details.
  3. 3Our team picks the one best placed for it, by area, the size of the job and MCS certification.
  4. 4Only that installer gets your details, and they book the survey with you.
  5. 5Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Commercial battery storage: FAQs

Does my business need a battery with solar panels?

Not always. A battery earns its keep when the panels make more than the site uses at the time and the business uses power later, in the evening or overnight. A site that uses almost all its solar as it is made gains little from one.

How does a battery save a business money?

By storing solar output that would otherwise be exported, and using it later instead of buying power. On the figures in our payback examples, a unit used on site saves 28.6p while a unit exported earns 4.1p, so each stored unit is worth the difference, less what is lost in charging and discharging.

Can a battery cut peak charges on our bill?

It can if your tariff charges more at certain times of day or for your maximum demand, and the battery is set up to discharge then. Check your bill or ask your supplier how your charges work before you rely on it; the installer models it from your half-hourly data.

Does a battery need permission from the network operator?

Storage is treated as part of the generation on the site. NGED's G99 forms cover electricity storage alongside generating equipment, and generation above 16A per phase must comply with G99. The installer includes the battery in the application.

Where can a commercial battery go?

Where the installer, your fire risk assessment and your insurer agree. As the responsible person for the premises you must carry out a fire risk assessment and review it regularly, so tell whoever does it, and your insurer, before a battery goes in.

Can we add a battery later?

Often, yes. Say at the survey that you might, so the inverter, the switchgear and the grid application allow for it. Adding storage later may need the network operator's agreement again.

Book a free site survey

Tell us a little about the business and how it uses power. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only