Guide for business owners

Flat Roof Solar Panels for Commercial Buildings

Free site survey

Step 1 of 2

Six quick tapsQuestion 1 of 6

What kind of survey would you like?

Free, no obligation. Your details go to one installer only.

Most flat commercial roofs can take solar if the structure can carry the extra weight and the waterproofing is sound. MCS defines a flat roof as one under 10 degrees and allows two ways of holding the panels down: ballast, which needs a structural engineer to confirm the roof can take it, or fixings through the roof, which need pull-out tests and care with the membrane and its warranty.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Can a commercial flat roof take solar?

Three things decide it: whether the structure can carry the panels (and any ballast), the condition and age of the waterproofing, and whether people can work on it safely. MCS requires the building to be assessed by a competent professional, and the installer must be able to show a structural assessment and a wind loading calculation for the specific mounting system (MIS 3002, 3.1.2 and 3.5).

  • Structure. Concrete decks, steel frames and timber joists each carry load differently. Ballasted systems add weight across the whole roof.
  • Waterproofing. A membrane near the end of its life is best replaced before panels go on, because lifting a system to re-roof later costs time and money.
  • Access and fragile areas. Rooflights and fragile sheets are a fall risk. HSE says work on or near fragile surfaces needs careful planning (HSE), and MCS asks designers to consider walkways and permanent protection over fragile elements such as skylights (MIS 3002, 3.6.2).
  • Shading and plant. Parapets, air handling units and lift rooms cast shade and need clear space around them for maintenance.

Ballasted or mechanically fixed: what the roof decides

Ballasted and mechanically fixed flat roof systems, as MIS 3002 treats them
BallastedMechanically fixed
How it stays putWeight and friction on the roof surfaceFixings into the deck or structure
Holes through the roofNone for the framesYes, each one sealed
What MCS requiresWind pressure coefficients from BRE Digest 489 or specific test data; a protection or slip layer compatible with the waterproofing; friction taken as 0.3 unless tested; a structural engineer's confirmation that the roof can carry the system and ballastOn an existing solid deck (concrete, brick or similar), a condition survey and pull-out tests; where the pull-out value can't be calculated reliably, tests to the Single Ply Roofing Association protocol
Gravel or green roofsSliding resistance from a test, or the system restrained (a kerb in front or tether cables)Fixings through the build-up

All of this is from MIS 3002 section 3.9 (MCS). The practical upshot: a lightweight roof that can't take ballast usually points to a fixed system, and a roof whose membrane you don't want pierced usually points to ballast, if the structure allows. The survey is where that is settled.

Not sure whether your roof can take ballast? The survey checks the structure and the waterproofing.

Book a free site survey

Roof membranes and warranties

MCS requires the installer to be able to show how the roof's weather-tightness has been kept after the work, which may include photographs, method statements, or confirmation that existing warranties remain valid (MIS 3002, 3.5.5(d)). On a ballasted system, the slip or protection layer under the frames has to be compatible with your waterproofing.

Before you sign, find the roof's guarantee and ask its manufacturer or roofing contractor what they need to keep it valid. If the membrane has only a few years left, ask for a price to replace it first: panels typically stay put far longer than an ageing membrane.

East-west or south-facing layouts

On a flat roof the installer chooses the angle and direction. South-facing rows tilted up make more per panel but cast shadows backwards, so they need gaps between rows. East-west layouts place panels back to back at a low tilt, fit more on the same roof and spread generation across the morning and afternoon.

Which suits you depends on when you use power. A business busy from early morning to late afternoon may use more of an east-west system's output on site. We don't publish a rule of thumb: the installer models both for your roof and your half-hourly data. See how much solar your business needs.

Metal roofs: profiled sheet, standing seam and composite panels

Many industrial units and warehouses have low-pitch metal roofs rather than true flat roofs. MCS requires the installer to check that the roof sheet thickness suits the brackets and screws and can withstand the extra wind uplift, and that the sheets are fixed to the main structure well enough to carry the extra loads (MIS 3002, 3.9.8 and 3.9.9).

  • Profiled sheet. Brackets fix through or onto the crowns of the profile.
  • Standing seam. Clamps fix to the seams, so the sheets themselves are not pierced.
  • Composite (insulated) panels. The outer skin, the core and the fixings all need checking.
  • Asbestos cement sheets. A different job altogether: see solar on an asbestos roof.

Planning limits for flat roofs

In England, solar on a non-domestic building is permitted development under Class J if the highest part of the equipment is no more than 1 metre above the highest part of a flat roof and no part is within 1 metre of the roof's edge. Listed buildings, buildings in their curtilage and scheduled monuments are excluded. Over 50 kW, you must ask the council first whether it needs to approve the design or appearance, in particular glare (Class J).

Wales sets the same 1 metre height and 1 metre edge limits for non-domestic buildings (GOV.WALES). In Scotland, panels on non-domestic buildings must not protrude more than 1 metre from the building's surface (circular 2/2024). Full detail by nation: planning permission for commercial solar.

What the survey checks on a flat roof

  • The structure. Deck type, spans and what the roof was designed to carry; whether a structural engineer is needed (always for ballast).
  • The waterproofing. Type, age, condition and guarantee.
  • Usable area. After the edge zone, plant, rooflights and maintenance routes.
  • Access. How panels and people get up there safely, and whether edge protection is needed.
  • The electrics. Where the cables run, the board, and the grid connection. See the site survey.

Sources

MCS, legislation.gov.uk, GOV.WALES, Scottish Government and HSE pages read on 2 November 2026.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Flat roof solar: FAQs

Can you put solar panels on a flat commercial roof?

Usually, if the roof structure can carry the extra weight and the waterproofing is in good condition. MCS treats any roof under 10 degrees as a flat roof and sets out two ways of holding the panels down: mechanically fixed systems, which need pull-out tests on solid decks, and ballasted systems, where a structural engineer must confirm the roof can take the panels and the ballast.

Do flat roof solar panels need planning permission?

In England, solar on a non-domestic building is usually permitted development if the highest part of the equipment is no more than 1 metre above the highest part of a flat roof and nothing is within 1 metre of the roof edge. Listed buildings and scheduled monuments are excluded, and systems over 50 kW need the council's prior approval first. Wales and Scotland have their own rules.

Will drilling through the roof affect my roof warranty?

It can. MCS requires the installer to evidence how the roof's weather-tightness has been kept, which can include confirming that existing warranties remain valid. Ask the roofing manufacturer or contractor before work starts, and keep their answer with the handover pack.

Are ballasted systems safe on a flat roof?

They are designed to be held in place by weight and friction. MIS 3002 requires the wind loads to come from BRE Digest 489 or specific test data, a friction value of 0.3 unless tested, a slip layer compatible with the waterproofing, and a structural engineer's confirmation that the roof can carry the system and the ballast.

Can solar go on a metal or profiled sheet roof?

Yes, and many industrial units have one. MCS requires the installer to check the roof sheet thickness is compatible with the brackets and screws and can withstand the extra wind uplift, and that the sheets are fixed to the main structure well enough to carry the extra loads.

Should panels on a flat roof face south or east-west?

Either can work. South-facing rows make more per panel but need gaps between rows so they don't shade each other; east-west layouts spread generation across the morning and afternoon. The installer models both for your roof and your daytime use, and the survey is where that is decided.

Book a free site survey

Tell us about the building and the roof. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners