Guide for business owners

Commercial Solar System Sizes: From 10 kW to 1 MW

Free site survey

Step 1 of 2

Six quick tapsQuestion 1 of 6

What kind of survey would you like?

Free, no obligation. Your details go to one installer only.

A system is sized in kWp: its output in ideal test conditions. Across the UK each kWp makes roughly 810 to 1,160 kWh a year on PVGIS figures, so a 50 kWp system makes about 40,000 to 58,000 kWh. Up to 50 kW the government publishes an average cost per kW; above that the price comes from a survey. What changes as you go up is the grid connection, the certification and planning.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

How system size is measured: kW and kWp

kWp (kilowatt peak) is the panels' combined output under standard test conditions. Proposals often write it as kW. Two other figures matter as much: the inverter rating, which can be lower than the panels' kWp and sets what the network operator is asked to allow, and the expected yearly generation in kWh, which is what saves you money.

Yearly generation is roughly the kWp times the yield for the site. The PVGIS yields in our payback calculator run from about 810 kWh per kWp in the Highlands and North Wales to about 1,160 on the south coast, with Birmingham at 968 and Exeter at 1,052 (PVGIS 5.3). The roof's direction, tilt and shading change it again, which is what the survey checks.

Approximate yearly generation by system size, from PVGIS regional yields
System sizeAt 810 kWh per kWpAt 1,160 kWh per kWp
10 kWp8,100 kWh11,600 kWh
20 kWp16,200 kWh23,200 kWh
30 kWp24,300 kWh34,800 kWh
50 kWp40,500 kWh58,000 kWh
100 kWp81,000 kWh116,000 kWh
250 kWp202,500 kWh290,000 kWh
1 MWp810,000 kWh1,160,000 kWh

Simple multiplication, for a sense of scale only. Your site's figure comes from the installer's design.

10 to 30 kW: shops, offices and small units

The size for a shop, a small office, a workshop, a surgery or a single industrial unit. DESNZ's 2025/26 averages for non-domestic systems are £1,320 per kW for 4 to 10 kW and £1,167 per kW for 10 to 50 kW (source), so a 20 kW system works out at about 20 × £1,167 = £23,340 as an average, and a 30 kW one at £35,010.

Most systems of this size are above the G98 limit of 16A per phase, so the network operator is asked before connection under G99 (NGED). Our worked example of a 30 kWp office in Birmingham is in the payback guide.

50 kW: what it takes and who it suits

50 kW is a common size for a farm building, a mid-sized factory unit, a hotel or a school. It is also a line in the rules: MCS's solar PV installation standard covers systems up to a maximum DC output of 50 kWp (MIS 3002), and DESNZ's cost data stops at the same point. At the 10 to 50 kW average, 50 kW is 50 × £1,167 = £58,350.

Our 50 kWp farm example near Exeter generates 52,610 kWh a year and pays back in 7.6 years on its stated assumptions; see the payback guide.

Find out the right size for your site, from your own data: book a free survey.

Book a free site survey

100 to 250 kW: factories, warehouses and farms

Large roofs on warehouses, factories and farm buildings can take 100 kW or more. At this size there is no government cost average, and the design depends on things a calculator can't see:

  • The roof's structure. Whether it can carry the extra load, and its condition and remaining life.
  • The connection. Whether the network can take the export, or whether the system needs to limit what it exports.
  • Your daytime use. A system this size can easily make more than the site uses on a quiet day.
  • Certification. Above 50 kWp the work is outside MIS 3002. Ask the installer how the system will be designed, tested and certified.

See warehouses, factories and farms for what the survey checks on each.

500 kW to 1 MW: large sites, the grid and planning

At this scale the grid connection usually decides the timetable and the design. The Smart Export Guarantee still applies: Ofgem says it covers installations up to 5 MW (Ofgem).

On planning, Class J of the permitted development order in England sets no capacity limit for solar on the roof of a non-domestic building (GPDO Part 14). Its conditions are about position: on a pitched roof, panels can't protrude more than 0.2 metres beyond the roof slope; on a flat roof, no higher than 1 metre above its highest part; nothing within 1 metre of the roof's edge; and not on a listed building or scheduled monument. Ground-mounted arrays and carports have their own rules: see solar carports.

What changes the price per kW

  • Size. DESNZ's data shows the cost per kW falling as systems get bigger.
  • The roof. Fixings for metal, fibre cement or flat roofs, ballast, and any repairs first.
  • Access. Scaffolding, edge protection, fragile rooflights and keeping the business open.
  • The connection. Network studies, export limitation or upgrades on larger systems.
  • Equipment and warranties. The panels, inverters, monitoring and any battery.

Sources

Costs, yields and thresholds were checked on 2 November 2026 (the PVGIS yields were taken for our payback calculator on 23 October 2026). Check the source before relying on a figure.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Commercial solar system sizes: FAQs

How much does a 50 kW commercial solar system cost?

The government's 2025/26 average for non-domestic systems of 10 to 50 kW is £1,167 per kW, which gives 50 × £1,167 = £58,350 as an average. That is the figure in our worked example, not a quote: your price depends on the roof, access, equipment and connection.

How much electricity does a 50 kW solar system produce?

Roughly 50 times the yield per kWp for the site. PVGIS gives about 810 to 1,160 kWh per kWp a year across the UK regions in our calculator, so about 40,000 to 58,000 kWh a year before the roof's direction, tilt and shading are taken into account. Our 50 kWp example near Exeter makes 52,610 kWh a year.

How much does a 100 kW solar system cost?

There is no government average above 50 kW. DESNZ's data stops there because it comes from MCS installations, and it shows the cost per kW falling as systems get bigger. A 100 kW price comes from a quote after a survey.

Does a 30 kW system need permission from the network operator?

In most cases, yes, before it connects. Under 16A per phase a system can be connected and the network operator told within 28 days (G98). Above 16A, which is 3.68 kW, per phase, G99 applies and the installer applies to the network operator first.

Is there a size limit for solar on a business roof without planning permission?

In England, Class J of the permitted development order has no capacity limit for solar on a non-domestic building's roof, but it has other conditions: panels on a pitched roof can't stick out more than 0.2 metres, on a flat roof no more than 1 metre above the highest part of the roof, and none within 1 metre of the roof's edge. Listed buildings are excluded.

What size solar system does my business need?

Size it to how much electricity you use in daylight, not to fill the roof. The installer works it out from your bills or half-hourly data at the survey.

Find the right size for your site

Tell us a little about the business and the site. We'll call to go through the checks, then arrange a free survey with one MCS certified installer, who sizes the system from your own data.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners