Guide for business owners

Planning Permission for Solar Panels on Commercial Buildings

Free site survey

Step 1 of 2

Six quick tapsQuestion 1 of 6

What kind of survey would you like?

Free, no obligation. Your details go to one installer only.

Most rooftop solar on business premises in England is permitted development under Class J, within limits on height and distance from the roof edge. Systems over 50 kW need the council's prior approval before work starts. Listed buildings always need consent, and ground arrays almost always need a planning application. Scotland, Wales and Northern Ireland each have their own rules, set out below.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Do I need planning permission for solar on my business premises?

Three questions settle most cases:

  • Where do the panels go?. On the roof of a non-domestic building, permitted development usually applies within limits. In a field or yard, only a tiny array is permitted. Over a car park, there is a separate right for canopies in England.
  • Is the building listed, or on a scheduled monument?. If so, permitted development doesn't apply.
  • How big is the system?. In England, rooftop systems over 50 kW are allowed, but only after the council's prior approval process.

Planning is separate from building regulations and from the grid connection, which every installation needs regardless. The installer checks all three at the survey.

Permitted development for non-domestic buildings in England

Class J of Part 14 of the General Permitted Development Order allows solar PV on a building that is not a house or block of flats, unless (Class J):

  • Pitched roofs. the equipment would stand more than 0.2 metres beyond the plane of the roof slope;
  • Flat roofs. the highest part would be more than 1 metre above the highest part of the roof (chimneys excluded);
  • Edges. any part would be within 1 metre of the external edge of the roof;
  • Protected sites. the building is listed, within the curtilage of a listed building, or on a scheduled monument.

Panels must, so far as practicable, be sited to minimise their effect on the building's appearance and the area's amenity, and be removed when no longer needed. Wall-mounted panels have their own limits.

Over 50 kW: prior approval

The law defines microgeneration as up to 50 kilowatts of electricity (Energy Act 2004, s82). For rooftop solar beyond that, Class J still applies but you must first ask the council whether its prior approval is needed for the design or external appearance, in particular the effect of glare on neighbours (Class J, J.4):

  • What you send. A written description, a site plan, a contact address and any fee.
  • Neighbours. The council puts up a site notice for at least 21 days or writes to adjoining owners or occupiers.
  • When work can start. When the council says approval isn't needed, when it gives approval, or after 56 days with no decision.
  • Afterwards. The work must follow the details approved or submitted.

Since the 2023 amendments, Class J sets no upper size limit for rooftop solar on non-domestic buildings. Your installer usually prepares the application. Allow for it in the timetable: see commercial solar system sizes for the other things that change above 50 kW.

The survey checks the planning position for your building before you commit to anything.

Book a free site survey

Ground arrays and car park canopies

For stand-alone solar at a non-domestic site in England, Class K allows one installation, no higher than 4 metres, at least 5 metres from the boundary, with no more than 9 square metres of panels and no dimension over 3 metres (Class K). A business-scale ground array needs a planning application. See ground mounted solar.

Canopies over non-domestic car parks have their own permitted development right in England, Class OA (Part 14), with height, distance and prior approval rules. See solar carports.

Listed buildings and conservation areas

Listed buildings and buildings in their curtilage are outside permitted development in England, Wales and Northern Ireland, and in Scotland the rights don't apply to listed buildings, so you need planning permission and listed building consent. Panels on an outbuilding, on the ground or over the car park are sometimes easier to agree than panels on the listed building itself.

Conservation areas don't remove the rights for roofs in England, but Scotland, Wales and Northern Ireland restrict panels facing a road there (see below). Councils can also remove permitted development rights with an Article 4 direction, most often in conservation areas (GOV.WALES).

Scotland, Wales and Northern Ireland

Permitted development for solar on non-domestic buildings outside England
Panels on buildingsStand-alone panels
Scotland (circular 2/2024)Class 6J: no part more than 1 metre from the building's surface; in a conservation area, not on the front elevation or a side elevation fronting a road. Not for listed buildings, within 3 km of an aerodrome, in a National Scenic Area, a historic garden or designed landscape in a National Park, or a World Heritage Site.Class 6N: up to 12 square metres in total; not in the front curtilage in a conservation area; the same exclusions.
Wales (GOV.WALES)No more than 200 mm proud of a wall or pitched roof; no more than 1 metre above a flat roof; not within 1 metre of the roof edge; not within 3 km of an airport or aerodrome; on designated land (National Parks, AONBs, conservation areas, World Heritage Sites) not on a wall or roof slope fronting a highway; not on listed buildings or scheduled monuments.One installation; no higher than 4 metres; at least 5 metres from the boundary; no more than 9 square metres.
Northern Ireland (Part 37)Class A: no more than 20 cm proud of a roof slope facing and visible from a road; no more than 2 metres above a flat roof and not within 2 metres of its edge; not above the ridge; in a conservation area or World Heritage Site not on a wall or slope facing and visible from a road; listed buildings only with listed building consent.Class B: no higher than 2 metres; at least 5 metres from the boundary; up to 30 square metres.

Before you start: what to check

  • Listing and designations. Whether the building is listed or the site is in a conservation area, National Park or other designated land.
  • Your planning history. Conditions on the original permission and any Article 4 direction (on the council's planning register).
  • System size. Over 50 kW in England means the prior approval step.
  • Your lease. If you rent, your landlord's consent is a separate question from planning. See solar on leased property.

Sources

legislation.gov.uk, Scottish Government and GOV.WALES pages read on 2 November 2026.

General information, not planning advice. Councils can remove permitted development rights on a site; check with yours before relying on them.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Planning permission for commercial solar: FAQs

Do I need planning permission for solar panels on a commercial building?

Often not, if the panels sit within the permitted development limits. In England, Class J allows solar on non-domestic buildings provided panels stand no more than 0.2 metres proud of a pitched roof, no more than 1 metre above the highest part of a flat roof, and no closer than 1 metre to the roof edge. Listed buildings and scheduled monuments are excluded, and systems over 50 kW need the council's prior approval first.

What is prior approval for commercial solar?

For rooftop solar that is not microgeneration (over 50 kW of electricity), you must ask the council before starting whether it needs to approve the design or external appearance, in particular glare on neighbours. You send a description, a site plan and your contact details. Work can start when the council says approval isn't needed, gives approval, or 56 days pass without a decision.

Do I need planning permission for solar on agricultural buildings?

The same rules apply as for any non-domestic building: in England, Class J covers barns, sheds and other farm buildings within the same height and edge limits. A ground array in a field is different: the permitted development limit is 9 square metres, so that needs a planning application.

Can I put solar panels on a listed business building?

Not under permitted development. In England, Wales and Northern Ireland the rights don't apply to listed buildings or buildings within their curtilage, and in Scotland they don't apply to listed buildings either. You need planning permission and listed building consent.

Are the rules different in a conservation area?

Yes, in places. In Wales, panels on designated land must not be on a wall or roof slope fronting a highway. In Scotland, panels on buildings in a conservation area can't go on the front elevation or a side elevation fronting a road. In Northern Ireland, they can't go on a wall or roof slope that faces onto and is visible from a road.

Can the council have removed permitted development rights on my site?

Yes. A condition on the building's original planning permission, or an Article 4 direction, can remove them. The Welsh Government's guidance says to check the council's planning register or ask the council. If the rights have gone, you need a planning application.

Book a free site survey

Tell us about the building and where you'd like the panels. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners