CASE STUDY · SOLAR INSTALLER · 4 MIN READ
Carbon Energy Savings: Why a Residential Solar Installer Measures Cost per Fitted Install
- domestic solar, not commercial
- Residential
- domestic solar, not commercial
- leads in the test and the next order
- 50, then 100
- leads in the test and the next order
- cost per fit, in his words
- About £2,100
- cost per fit, in his words
- where Carbon is based
- Glasgow
- where Carbon is based
In short
This one is residential, not commercial. Carbon Energy Savings is a home-improvement solar installer in Glasgow, working across the UK. For this campaign our team generated opt-in leads and passed them to Carbon's own contact centre, which booked its own appointments; it started with 50 and moved on to 100. Scott, an operations director, explained the number Carbon actually judges leads by, cost per fitted install, and the checks it runs before a rep goes out. Both are worth knowing whatever work you do.
On this page
Who Carbon Energy Savings are
Scott is "one of the operations directors at Carbon Energy". The company is "based in Scotland sitting in sunny Glasgow just now. But we have got experience all over the UK so we are venturing down south of the border very soon."
It used to work under another company's banner: "We were writing about 70% of their business." On its own since April, "the turnover projection we've got now from a standing start really of April is about 10 million pounds", with the aim of doubling that in the next 12 months.
This was a residential campaign. Solar Surveys UK's own service is commercial solar site appointments, so read this page for the lessons, not as a description of what we offer installers today.
Cost per fit, not cost per sale
Carbon tracks two numbers: cost per sale, and cost per solid sale, meaning a job that is actually fitted. The gap between them is cancellations:
There's quite a lot of cancellations, so you can have your good KPIs and your good reps are converting at a one in three or one in four sales rate conversion wise. But actually it's less than that.
On the first test, Scott's figure was this: "So the cost per fit came down to about 2,100 pounds, which is fantastic for us." The lesson carries over to commercial work: judge a lead source by the installs it leads to, not only by the meetings or sales on paper. Our guide to commercial solar lead costs sets out how commercial appointments are priced.
Why Carbon runs its own checks before a visit
Carbon prefers raw leads to booked appointments, so its own team decides what goes in the reps' diaries:
we actually like buying raw leads effectively. It just means that our contact center still has a degree of control and we know what's going into the guys' diaries.
Every lead goes through "the rigorous, first call with us, then a quality assurance call, then a QC check" before an appointment is set. Scott says appointments booked by others have not converted as well into fitted jobs because they skip those steps.
Commercial leads on Solar Surveys UK come with that qualifying already done, and our commercial solar survey checklist covers what to confirm yourself on site. You only pay for appointments that are actually attended, and any that aren't viable we replace.
Knowing where the leads come from
Carbon buys leads from several sources, so it needs to know how each one is made, or it pays twice for the same homeowner. Scott valued that we were open about it: "so we don't feel like we're in the dark in terms of how you're generating those leads". The leads came from adverts our team ran; our solar advertising guide covers running your own.
His spend on leads gives that weight: "for a company your size and a company our size it's seven figures a year." Did the service meet expectations? "Exceeded. Exceeded. Absolutely."
What next
I think you have the ability to become our main partner.
Scott summed up the relationship as "open flexible you guys listen to what we want and you're delivering", and when asked whether he would recommend us: "Hundred percent. Absolutely." Domestic installers also need the consumer protection side in place; our guide to PAS 2030, TrustMark and RECC covers it.
The full interview is in the video above. TNW Marketing's own write-up of Scott's interview is on tnwmarketing.com. More installers talk about their leads in our case studies and on the reviews page.
Carbon Energy Savings case study: FAQ
Was the Carbon Energy Savings campaign commercial?
No. It was residential (domestic) solar: our team generated opt-in leads and passed them to Carbon's own contact centre, which booked its own appointments. Solar Surveys UK's own service is commercial solar site appointments.
What was Carbon Energy Savings' cost per fit?
In Scott's words, "the cost per fit came down to about 2,100 pounds, which is fantastic for us."
Why does Carbon measure cost per fit rather than cost per sale?
Home improvement has a lot of cancellations, so a sale on paper does not always become a fitted install. Carbon judges its lead sources by the installs they lead to.
How many leads did Carbon start with?
Fifty in the first test, then an order of 100.
Related guides
- Commercial solar lead costs
How the price of a lead is worked out.
- Solar advertising
Running your own paid ads as an installer.
- PAS 2030, TrustMark and RECC
The consumer protection schemes for domestic solar.
- MCS certification for installers
What it takes, what it costs and how long it lasts.
- Commercial solar survey checklist
What to confirm before, during and after the site visit.
- All case studies
Installers on video, and what they got.
- Commercial solar leads
Survey appointments with business owners, booked for you.
Browse leads free
Commercial solar survey appointments with business owners near you. Look at as many as you like, and only pay for appointments that are actually attended.