GUIDE · FOR UK SOLAR INSTALLERS · 11 MIN READ
MCS Certification for Solar Installers: How to Get It and Keep It
The short answer
MCS certifies the business, not the individual. To install solar PV under it you name a Licensee, a Main Contact and a qualified Technical Supervisor, put processes in place, apply to one of five certification bodies that cover solar PV, pass MCS's scheme checks and an assessment of a finished installation, then sign an Installer Agreement with MCS. The scheme was redeveloped in 2026: Consumer Code membership is no longer mandatory, every certified installer must be on the new scheme by 31 March 2027, and solar PV is in scope up to 50kW.
Every rule, fee and date below is sourced at the end.
What MCS is and why it matters
MCS is the UK's quality mark for small-scale renewables. Being certified lets you use the MCS Certification Mark, puts you on the MCS Find an Installer tool, and lets you raise an MCS certificate for each installation.
For solar PV, the commercial weight is the Smart Export Guarantee. Ofgem's guidance says that for PV of 50kW or less, both the installation and the installer must be suitably certified to get SEG payments: an MCS certificate, or an equivalent scheme accredited to EN 45011 or EN ISO/IEC 17065. Without that, the export supplier isn't obliged to pay. Above 50kW and up to 5MW only the installation needs certifying, and the supplier decides how.
That 50kW line matters commercially: MCS covers solar PV and battery storage only up to 50kW, though businesses, landlords and developers count as customers. Bigger roofs fall outside the scheme, and the grid side is a separate job: see G98 notification and limits, the G99 application for commercial solar and which DNO to apply to.
The redeveloped scheme: what changed
MCS's redeveloped installer scheme is live: NICEIC says it has assessed all new applicants under it since 9 March 2026, and MCS says every certified installer must be on it by 31 March 2027. The key changes, per MCS:
- Consumer Code membership is no longer mandatory. You follow the MCS Customer Commitment instead.
- You buy an MCS approved financial protection product for each customer. MCS says approved products give at least six years' cover.
- A new Installer Agreement held directly with MCS (NICEIC says it replaces the sub-licence installers held with it).
- Risk-based assessment: how often you're assessed depends on your record.
- 30 days to create an MCS certificate, instead of 14.
- Centralised complaints handling and a dedicated MCS Account Manager.
If you're still on the current scheme, NICEIC says your Consumer Code membership (RECC and HIES are both approved by the Chartered Trading Standards Institute) must be kept until you transition. On 18 June 2026 MCS announced that DESNZ had recognised the redeveloped scheme as a Code of Practice for the Boiler Upgrade Scheme.
The standards you're assessed against
The latest edition of each applies. Versions as listed in the MCS Standards & Tools Library on 7 October 2026:
| Document | Reference | What it covers |
|---|---|---|
| Installer Operating Requirements | MCS:2025 Issue 2.0, 8 Sep 2026 | How you gain and keep certification: roles, assessments, scheme checks, records, customers. |
| Customer Commitment | Version 1.1, 8 Sep 2026 | Your duties to customers. A copy goes to the customer before the contract. |
| Solar PV installation standard (redeveloped scheme) | MIS 3002:2025 Version 2.0, 18 Mar 2026 | Design and installation requirements for solar PV. |
| Solar PV installation standard (current scheme) | MIS 3002 Version 6.0, 18 Mar 2026 | The same, for installers not yet moved across. |
| Pre-sale Information and System Performance Estimate Standard | Latest edition on the MCS website | What the customer must be given, and how the performance estimate is worked out, before they sign. |
| Battery Installation Standard | MIS 3012 | Only if you want battery storage certification as well. |
| MCS Contractor Standard and Competency Standard (current scheme) | MCS 001-1 and 001-2 Issue 4.2; MCS 025 Version 2.0 | The current scheme's rules, for installers not yet on the redeveloped scheme. |
The performance estimate and pre-sale information go to the customer before they sign. For tools to produce them, see our guide to solar design software for UK installers compares the options.
How to get MCS certified, step by step
From the MCS becoming-certified pages and the Installer Operating Requirements. Your certification body will guide you through its own version.
- 1
Check your scope
MCS covers solar PV and battery storage up to 50kW, on domestic and commercial contracts. Only products listed in the MCS Product Directory can be installed (battery storage excepted), and all must be new.
- 2
Name your three core roles
A Licensee who signs the Installer Agreement and accepts ultimate responsibility; a Main Contact, who must be an employee, for scheme queries; and at least one Technical Supervisor for solar PV. A sole trader can hold all three.
- 3
Get the Technical Supervisor qualified
They need an in-date MCS approved qualification, or a personnel certification to ISO/IEC 17024. MCS publishes the approved list and a training course finder.
- 4
Put processes and controls in place
Scaled to your size: Appendix A of the Installer Operating Requirements sets four scenarios, from a sole trader in one region (A) to 250+ staff or subcontractors across several regions (D).
- 5
Apply to a certification body
Give your trading status, ownership, staff numbers, technologies, Main Contact, insurances and certification history. Its fees apply whether or not you pass.
- 6
Pass the MCS scheme checks
MCS checks your finances, insurance, directors, public footprint, treatment of customers and past complaints, including a 15-minute call.
- 7
Pass the assessment
The certification body checks your processes and controls and visits at least one solar PV installation you were fully responsible for. You need a finished, compliant installation before it can happen.
- 8
Close any non-conformities
For each one, send the root cause and your corrective and preventive actions, within six weeks of the report subject to severity.
- 9
Sign the Installer Agreement
The certification body issues a Certificate of Conformity, MCS does a final review, then you and MCS sign. Only then can you operate as MCS certified.
The product rule is worth settling with your supplier early: check that the panels and inverters you plan to fit are listed in the MCS Product Directory. Our list of UK solar wholesalers and distributors is a starting point. NICEIC also lists £2 million public liability and £250,000 professional indemnity insurance as requirements under the Installer Agreement and scheme rules.
MCS certification bodies for solar PV
A certification body is a UKAS-accredited organisation (to ISO/IEC 17065) that assesses you on MCS's behalf. Apply to one that covers the technologies you want. On 7 October 2026 MCS listed five for solar PV, all of which also cover battery storage:
- Amtivo Group (British Assessment Bureau)
- Certsure LLP, trading as NICEIC
- NAPIT Certification Ltd
- Simply Certification
- The IAA (Installation Assurance Authority)
HETAS and OFTEC are also MCS certification bodies but don't list solar PV. APHC's accreditation is currently suspended by UKAS.
MCS certification cost
MCS says certification body fees vary. Published prices for one technology from two of them, plus the MCS charges:
| Item | Published fee |
|---|---|
| NICEIC — first year, one technology | £855 ex VAT (£95 application, £705 certification, £55 MCS licence) |
| NICEIC — second year onwards, one technology | £640 ex VAT plus £55 MCS licence fee |
| NAPIT — initial, one technology | £830 ex VAT including the MCS listing fee (renewal £705) |
| NAPIT — initial, two technologies (e.g. PV and battery) | £1,100 ex VAT (renewal £950) |
| MCS — each installation registered | £30 |
| MCS approved financial protection product | Per customer; MCS publishes no price — ask the providers |
NICEIC's fees are stated as correct for 2026/27, with extra charges for additional assessments, late rescheduling and changing your Technical Supervisor. Add training and insurance, and check current prices before you apply.
Keeping your certification
Under the Installer Agreement and Installer Operating Requirements you must:
- register every in-scope installation by raising an MCS certificate on the MCS Installation Database within 30 calendar days of commissioning, recording its Technical Supervisor and the customer's contact details (MCS contacts every customer);
- give the customer the Customer Commitment before the contract, a written guarantee for design and workmanship, and the approved financial protection;
- keep installation records for at least six years;
- keep Technical Supervisors' qualifications in date, and never self-certify work without one available to sign it off.
Surveillance is risk-based. In your first two years expect at least one site-based assessment per technology each annual cycle. After that NICEIC applies three frequencies: reduced (every three years, after two years and two consecutive passes), standard (annual, at least one site per technology) and enhanced (annual, at least five sites). Go more than a year without registering an installation of a technology and your certification body must examine your processes again.
MCS umbrella schemes
MCS defines an umbrella scheme as a contractual arrangement in which an MCS certified business appoints a network of subcontractors, instead of its own staff, to do some or all of the work. The operator is responsible for all of it, raises the MCS certificates, and is the one the customer contracts with.
MCS says they are particularly associated with heat pumps: in its 2021 consultation, 36% of responding operators ran air source heat pump schemes and 16% solar PV. Under the redeveloped scheme, using subcontractors means contracts that hold them to account and the tougher controls of scenario C or D.
Why applicants fail
- No compliant first installation. Initial certification needs a site assessment of a solar PV installation you were fully responsible for (one done as a subcontractor can count, with the main installer's permission).
- Technical Supervisor not qualified on the day. The qualification or personnel certification must be in date when an installation is certified. NAPIT's checklist asks larger firms for a register with expiry reminders.
- Uncertified products. Panels or inverters without an active MCS Product Directory listing can't be installed under the scheme.
- Failing the scheme checks. MCS may refuse an Installer Agreement if you fail them, or if information you declared turns out to be wrong.
- Thin records. NAPIT's checklist expects a complaints log with root causes, records of all quotations and installations, and access to the standards, including BS 7671 and the IET Code of Practice for PV.
- The usual installation faults. MCS expects root causes to relate to inadequate training or supervision, inappropriate or missing materials, or incorrect design or installation assumptions.
After certification: filling the diary
Certification gets you on the Find an Installer list. It doesn't book surveys. The next job is a steady flow of work, and for commercial jobs that means sitting down on site with the person who signs off the spend. Our guide to how to get commercial solar leads compares nine channels, and how to sell commercial solar covers turning a survey into a contract, with our commercial solar survey checklist for the visit itself.
Solar Surveys UK books qualified commercial solar survey appointments with business owners for UK installers. You pay per booked appointment, with no retainer, from £400+VAT to £1,000+VAT per lead depending on system size (see how much commercial solar leads cost). Read how booked solar leads differ from form fills or see our commercial solar leads.
MCS certification: FAQ
How much does MCS certification cost?
It depends on the certification body. For one technology, NICEIC lists £855 ex VAT for the first year and NAPIT £830 ex VAT, both including the £55 MCS licence or listing fee. MCS then charges £30 per installation registered, and you buy an approved financial protection product for each customer.
How long does it take to become MCS certified?
MCS doesn't publish a total. It depends on how fast you complete a compliant first installation, pass the checks and assessment, and close any non-conformities (within six weeks of the report). NICEIC says an assessment takes about three hours.
Do I still need to join RECC or HIES?
Not under the redeveloped scheme: MCS says Consumer Code membership is no longer mandatory, and the Customer Commitment applies instead. NICEIC says installers still on the current scheme must keep their Consumer Code membership until they transition, which all must do by 31 March 2027.
Does MCS cover commercial solar?
Up to 50kW. The scheme covers domestic and commercial contracts, but solar PV and battery storage are only in scope up to a maximum of 50kW.
Do customers need an MCS certificate for the Smart Export Guarantee?
For solar PV of 50kW or less, Ofgem's guidance says the installation and the installer must be suitably certified: MCS, or an equivalent scheme accredited to EN 45011 or EN ISO/IEC 17065. From over 50kW to 5MW only the installation needs certifying, and the export supplier decides what evidence it accepts.
What is an MCS umbrella scheme?
An MCS certified business that uses a network of subcontractors for some or all of the work, instead of its own staff. The operator, not the subcontractors, is responsible for all the work and raises the MCS certificates, and the customer contracts with the operator.
Which certification bodies can certify solar PV?
On the MCS list checked on 7 October 2026: Amtivo Group (British Assessment Bureau), Certsure (NICEIC), NAPIT, Simply Certification and The IAA. HETAS, OFTEC and APHC don't list solar PV, and APHC's accreditation is suspended by UKAS.
Sources
Checked 7 Oct 2026. Official documents from MCS and Ofgem, and published pages from MCS certification bodies and consumer codes. Where a rule or fee is one certification body's own, the text says so. This is a summary, not advice: confirm with MCS or your certification body.
- MCS — Becoming certified (steps, roles, certification bodies)
- MCS — Becoming certified (costs and £30 installation fee)
- MCS — Certification Bodies (technologies covered, MCS licence fee)
- MCS — Redeveloped Installer Scheme (key changes)
- MCS — Moving over to the redeveloped installer Scheme
- MCS — DESNZ recognises strength of consumer protections offered by redeveloped MCS (18 June 2026)
- MCS — Financial protection under the redeveloped Scheme
- MCS — Standards & Tools Library (MIS 3002, MCS 001, MCS 025 versions)
- MCS — Installer Operating Requirements, MCS:2025 Issue 2.0 (8 Sep 2026)
- MCS — Blog: MCS umbrella schemes (27 Jan 2021)
- MCS — Findings of the umbrella scheme consultation (15 Dec 2021)
- Ofgem — Smart Export Guarantee: Guidance for Generators
- NICEIC — MCS Installer Scheme (fees 2026/27, assessment frequency)
- NAPIT — Microgeneration Certification Scheme (MCS) prices
- NAPIT — MCS Redeveloped Installer Scheme
- NAPIT — MCS Redeveloped Scheme Assessment Guidance Document and Checklist
- RECC — RECC reinforces its value in consumer protection following MCS update (28 Apr 2026)
- HIES — Home Insulation and Energy Systems Quality Assured Contractors Scheme
Related guides
- All installer guides
Every guide for UK solar installers in one place.
- Commercial solar leads
Booked survey appointments with UK business owners.
- Solar leads UK: booked surveys, not form fills
What separates a good solar lead from an expensive one.
- How much do commercial solar leads cost?
Pricing by system size and the maths on a lead.
- How to get commercial solar leads: 9 channels compared
Where commercial work comes from, and what each channel costs.
- G98 explained: notification, limits and forms
Fit-and-inform for small, type-tested systems.
- G99 application for commercial solar
Forms, steps and timescales for bigger connections.
- DNO application for solar: which DNO and how to apply
Find the network operator and get the paperwork right.
- How to sell commercial solar
From booked survey to signed contract.
- Commercial solar survey checklist
What to confirm before, during and after the site visit.
- Solar design software for UK installers
Tools for layouts, yield estimates and proposals.
- UK solar wholesalers and distributors
Where installers buy panels, inverters and batteries.
- MIS 3002 explained for solar PV installers
The MCS solar PV standard: scope, performance estimates, design, commissioning and handover.
- How to become a solar installer in the UK
Qualifications, training routes, MCS and the step to running your own solar business.
- SEO for solar companies
How UK installers win commercial solar enquiries from Google: pages, Google Business Profile, reviews, links and what it really takes.
- Solar advertising: Google and Facebook ads
Running Google, Meta and LinkedIn ads for commercial solar enquiries: targeting, landing pages, ad rules and what it really takes.
- Solar partnerships and referrals
Winning commercial solar work through energy brokers, landlords, contractors and customer referrals, and what it really takes.
- UK solar lead companies compared
Eight suppliers side by side: lead type, pricing, contracts and commercial vs residential.
Certified? Fill the diary with commercial surveys
Booked commercial solar survey appointments with UK business owners. Pay per appointment, no retainer.