CASE STUDY · COMMERCIAL SOLAR INSTALLER · 4 MIN READ
IndyGen: A Power Plant Developer's Move Into Commercial Rooftop Solar
- the systems it was seeing
- 200 to 300kW
- the systems it was seeing
- working with our team at interview
- 1 to 2 months
- working with our team at interview
- where IndyGen came from
- Utility scale
- where IndyGen came from
In short
IndyGen is an independent power plant developer that had recently moved from utility-scale projects into commercial and industrial rooftop solar. Utility-scale developers deal with very few customers, so finding many commercial buyers was new to it. Rather than gamble on hiring a sales director, it worked with our team. A month or two in, the systems it was seeing were two to 300 kilowatts, which it calls ideal because the businesses behind them decide quickly.
On this page
From utility scale to commercial rooftops
IndyGen is a power plant developer that "recently Diversified into the commercial and industrial space", bringing what it does at utility scale down to on-site rooftop solar for businesses.
That move changes the job. A utility-scale developer deals with very few customers; commercial rooftops mean many. In IndyGen's words: "we're a power plant developer we're very antisocial we don't speak to very many people we don't need to". It knew the product and the commercial case. What it lacked was "connections to customers on a on a wider scale".
Why it did not hire a sales director
The traditional route is to hire a sales director with a network. IndyGen saw the risk in that:
it's quite a heavy investment with no guarantee of return because you're gambling you're gambling on the guy you pick
Comparing what it pays us with what an internal hire would cost in wages, its conclusion was: "I think that we are doing better with TNW than we would with a an internal guy whose job it was to be generating leads". On whether the pricing scales: "I think it it works well for us at the minute". You only pay for appointments that are actually attended, and any that aren't viable we replace.
If you are weighing up the same choice, our guides to how to get commercial solar leads and commercial solar lead costs set out what each route involves.
Approaching with caution
IndyGen had seen lead generation go wrong. "one of our installer subsidiaries has used lead generation before", and the problem was the same leads sold to several installers: "it was multiple selling multiple leads". So "we approached TNW with caution". What it found instead:
it's much more collaborative you're not just getting a lead and then selling it to a load of different people and a race to the bottom
On Solar Surveys UK each project shows without the business's name or contact details. You register interest, our team matches it to the installer best placed for it, and only that installer gets the details.
Why two to 300 kilowatts is the right size
The systems IndyGen had seen were "pretty ideal two to 300 kilowatt systems". The reason is who decides:
- These are smaller businesses, often family companies with a few directors, so "the decision making process is is going to be a lot faster".
- Larger projects take longer: "anything bigger than that you're into a much longer gestation period before decisions made because you got boards to go through".
Systems of that size go through a full G99 application with the network operator, and connection queues are changing; our guides to the G99 application and grid connections reform cover both.
Asked if it would recommend us, IndyGen joked that it was "hesitant to recommend because I don't want a competition".
The full interview is in the video above. TNW Marketing's own write-up of IndyGen's interview is on tnwmarketing.com. More installers talk about their leads in our case studies and on the reviews page.
IndyGen case study: FAQ
Who is IndyGen?
An independent power plant developer that had recently moved from utility-scale projects into commercial and industrial on-site rooftop solar.
Why did IndyGen not hire a sales director?
It saw it as "quite a heavy investment with no guarantee of return", a gamble on the person you pick. Comparing costs, it says it is doing better with our team than it would with an internal hire generating leads.
What size systems did IndyGen see?
Two to 300 kilowatts, which it calls ideal because smaller, often family-run businesses with a few directors can decide quickly, while bigger projects go through boards.
Why was IndyGen cautious about lead generation?
One of its installer subsidiaries had used lead generation before and found the same leads were sold to several installers.
Related guides
- G99 application
Who submits it, the forms, the DNO steps, fees and timescales.
- Grid connections reform
What the new connection queue means for solar projects.
- How to sell commercial solar
From booked survey to signed contract.
- How to get commercial solar leads
The channels installers use, and what each one takes.
- Commercial solar lead costs
How the price of a lead is worked out.
- All case studies
Installers on video, and what they got.
- Commercial solar leads
Survey appointments with business owners, booked for you.
Browse leads free
Commercial solar survey appointments with business owners near you. Look at as many as you like, and only pay for appointments that are actually attended.