CASE STUDY · COMMERCIAL SOLAR INSTALLER · 6 MIN READ
Rural and Country Energy: How a Commercial Director Cut Seven Lead Providers to Two
- lead providers in a year
- 7 to 2
- lead providers in a year
- of his leads come from our team
- 80%
- of his leads come from our team
- his average site
- 150 to 200kW
- his average site
- proposed each month
- 3 to 4MW
- proposed each month
In short
Rich Morris is commercial director at Rural and Country Energy, a 14-year-old renewables business with about 40 salaried staff that formally opened its commercial division in late 2024. In a year he tried seven lead providers and kept two; TNW Marketing, the team behind Solar Surveys UK, now supplies about 80% of his leads. He accepts about 80% of what is offered (the rest are usually too small), his sites average 150kW to 200kW, and the questions he asked for, such as single or three phase, the feed-in tariff on existing solar and listed building status, are now asked before every booking.
On this page
A rural renewables business building a commercial division
Rural and Country Energy is "14 years in in renewables", and made its name on heat pumps and solar for "farms and big country homes". It employs its own engineers and its commercial team on salaries, "not on commission only", which Rich says needs a different model from a sole trader selling small solar jobs.
The commercial division formally opened in October or November 2024, and our team was "one of the first people that we really started working with". At the time of the interview Rich had about three megawatts installed, about eight megawatts under proposal and was "looking at closing another two and a half megawatts in the next two months."
He is frank about the cost of getting there: "you need to have a couple hundred grand behind you" to move into commercial. If you are weighing up the same step, our guide to starting a solar business covers the set-up side.
Seven providers to two: what made the difference
"I've had seven different leads providers in the last year," Rich said. "I'm down to two. You guys provide us with 80% of our leads." One of the others was much cheaper per lead, and Rural and Country could send leads back, but "we were kicking back 67% of the leads". A call with that provider's MD ended in an argument.
With our leads he turns down about one in five, usually because they are too small, and there is no pushback when he does: "there's never a are you sure? What about this?" The rest suit him: "probably 80% of the leads you send through, we accept".
He also likes when the money changes hands: "we pay for the appointment once it's sat and we can get proposal away. That's when we pay for it." You only pay for appointments that are actually attended, and any that aren't viable we replace.
The questions he had added before every booking
Rich's view is that a commercial job has "so many things that can make it fall over", so the information at the start has to be right. Each meeting now comes with "a really good report before the meeting", and several of its questions came from him:
- 1
Single phase or three phase?
This was not asked at first; now it is. The supply decides what can be connected, and our G99 application guide covers what the DNO will ask about it.
- 2
Existing solar, and its feed-in tariff
If the site already has solar, the feed-in tariff on it is now asked for, so you know about the existing system before you design around it.
- 3
Is it a listed building?
"is it grade two listed for example in a building you know because that will have a that will have an impact if it's grade two listed is there curtilage that we can use"
If not the roof, is there space nearby, and could planning be got for it if it is out of sight? Our commercial solar planning permission guide covers listed buildings and curtilage.
- 4
Roof space and building height
"is there enough roof space that you know, is it a really high building"
Both shape the design, the access and the cost. The commercial solar survey checklist has the rest of what to check on the roof.
What he values is the speed of the change: "you're a speedboat ... It's not a case of three weeks later still saying, 'Guys, look, that's still not happened.' You know, it's an immediate effect."
Why 150 to 200kW suits a business with its own install teams
Sites range from "a 60 70 80 kilowatt size system" up to "a couple of meg size size opportunities off you as well that we're closing in on". Averaged out, "we're probably looking at between, you know, 150 to 200 kilowatts".
He calls that "a lovely lovely size for for commercial", because one team can fit it in: "we can do 50 kilowatts installed in a week, you know, per team, you know, so we can do, you know, one team, four weeks." A megawatt site needs two or three teams for about 16 weeks.
Rural and Country was proposing "some in the region of three to four megawatts a month" and aimed to double its number of design consultants by the end of the year. Rich also brought our team in on the domestic side of the business.
- Q: So, all of the to all of the solar installers in your area would you recommend us to to use our services?
- Rich: There's loads and loads of business out there. There's there's enough to be done. If we all do it right, there's enough for all of us to to make to make a nice living out of it ... And the process at the start is make sure you're getting good quality leads. And if you want good quality leads, then 100%, you know, I'd endorse these guys.
The full interview is in the video above. TNW Marketing's own write-up of Rich Morris's interview is on tnwmarketing.com. More installers talk about their leads in our case studies and on the reviews page.
Rural and Country Energy case study: FAQ
How much of Rural and Country's commercial work comes from our team?
Rich Morris says that of the two lead providers he kept out of seven, our team provides about 80% of his leads.
How many leads does Rural and Country turn down?
About 20%, usually because they are too small for the business. Rich says there is never any pushback when he says no to one.
What questions did Rural and Country ask to be added to the leads?
Whether the supply is single phase or three phase, the feed-in tariff on any existing solar, whether the building is listed (and if so whether there is curtilage that could be used), and the roof space and height of the building.
What size are Rural and Country's sites?
They range from around 60kW to 80kW up to megawatt opportunities, and average about 150kW to 200kW. One install team does about 50kW a week, so a typical site takes one team three or four weeks.
When does Rural and Country pay for an appointment?
In Rich's words: "we pay for the appointment once it's sat and we can get proposal away." You only pay for appointments that are actually attended, and any that aren't viable we replace.
Related guides
- Commercial solar planning: installer checks
Class J permitted development, prior approval over 50kW, conservation areas, listed buildings and building regs.
- G99 application
Who submits it, the forms, the DNO steps, fees and timescales.
- Commercial solar survey checklist
What to confirm before, during and after the site visit.
- How to start a solar panel business in the UK
Structure, VAT, MCS roles and fees, insurance, safety, suppliers and first customers.
- How to choose a solar lead company
Seven checks before you buy, with eight suppliers' own published terms.
- All case studies
Installers on video, and what they got.
- Commercial solar leads
Survey appointments with business owners, booked for you.
Browse leads free
Commercial solar survey appointments with business owners near you. Look at as many as you like, and only pay for appointments that are actually attended.