Dairy farms use electricity every day of the year, and most of it goes on three jobs. Data from a Welsh project quoted by AHDB put milk cooling at 38% of total energy, water heating at 30% and the vacuum pump at 20%. Solar can cover a good share of that if it falls in daylight, and big shed roofs give room for panels. Checked against AHDB on 2 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Why dairy farms suit solar

AHDB says the use, and therefore cost, of electricity dominates fixed equipment energy use on a dairy farm, with milk cooling, water heating and vacuum pumping the most energy intensive processes (AHDB).

Share of total energy by process on dairy farms, Welsh project data quoted by AHDB
ProcessShare of energyWhen it runs
Milk cooling38%During and after each milking, and through the day in bulk tanks
Water heating30%For parlour and line cleaning; can often be timed
Vacuum pump20%During milking
Washing and water pumping6%Through the day
Lighting and other6%Varies

Source: AHDB. Separately, AHDB says the vacuum pump accounts for about 20 to 25% of energy use on a normal dairy farm (AHDB).

Milking times and solar output

Panels produce most around the middle of the day, and far more in summer than in winter. Milking often happens early in the morning and late in the afternoon. So the fit depends on the farm:

  • Robotic milking. Spreads milking through the day and night, so some of it always falls in daylight
  • Twice-a-day parlours. Summer milkings sit in daylight; winter ones often don't
  • Cooling after milking. Bulk tank cooling carries on after milking ends, into the daylight hours
  • Water heating. Can often be timed for midday to use solar rather than cheap night power
  • Day and night tariffs. AHDB advises understanding your tariff and using day and night rates well; solar changes that sum

AHDB recommends metering the three big users separately so you can see the pattern (AHDB). Twelve months of half-hourly data does the same job for the whole farm.

See how much of your dairy's power solar could cover: book a free site survey.

Book a free site survey

Asbestos and fibre cement parlour roofs

Many older parlours and sheds have fibre cement roofs that may contain asbestos, are often fragile, and may not take the weight of panels. The options are overcladding, replacing the roof, or using a newer building or the ground. Our guide to asbestos cement roofs covers each, and ground-mounted solar covers arrays on spare land.

Batteries for early and late milkings

A battery charged by midday output can run the evening milking and cooling. Whether it pays depends on how much surplus the farm has at midday, the size of the herd and the price you pay for night-time electricity. If the farm already uses most of its solar output in the day, a battery adds little. See commercial battery storage.

Grants and tax relief

Farm grant schemes open and close; our farm solar grants page lists what was open in each nation when we checked. A farm business that buys the system can usually claim capital allowances. Rooftop solar is left out of business rates valuations in England, Scotland and Wales until 2035: see business rates. For the wider farm picture, see solar for farms.

Sources

AHDB's dairy energy pages were read on 2 November 2026. The process shares are from a Welsh project quoted by AHDB and vary farm to farm.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Solar for dairy farms: FAQs

Are solar panels worth it on a dairy farm?

Often. AHDB says milk cooling, water heating and vacuum pumping are usually the three biggest energy users on a dairy farm, and they run every day of the year. A large parlour or cubicle shed roof gives room for panels. How much the panels save depends on how much of that use falls in daylight, which depends on your milking times and equipment.

What uses the most electricity on a dairy farm?

Milk cooling. Data from a Welsh project quoted by AHDB put the shares of total energy at milk cooling 38%, water heating 30%, vacuum pump 20%, washing and water pumping 6%, and lighting and other uses 6%.

Does solar help if we milk early and late?

Partly. Morning and evening milkings in winter often fall outside the hours when panels produce much, but cooling continues after milking, water heating can be timed, and summer days are long enough to cover more of both milkings. A battery can store midday output for the evening milking; whether it pays depends on the size of the herd and your tariff.

Can solar go on an asbestos parlour roof?

Not straight onto old fibre cement sheets that may contain asbestos without checks. The usual options are overcladding, replacing the roof, or putting the panels elsewhere, such as a newer shed or the ground. Our guide to asbestos cement roofs explains each.

Are there grants for solar on dairy farms?

Farm grant schemes open and close. Our farm solar grants page lists what was open in each nation when we last checked. Capital allowances can reduce tax for a farm business that buys the system.

Book a free site survey for your farm

Tell us about the farm, the buildings and your milking routine. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners