Solar for holiday parks and campsites

Solar Panels for Holiday Parks, Campsites and Marinas

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

Holiday parks are busiest when the sun is strongest, so solar output lines up with demand. Two facts help the sums: HMRC treats self-catering holiday accommodation as residential, so solar on lodges and lets is zero-rated for VAT until 31 March 2027; and the Workplace Charging Scheme lets a small accommodation business claim up to £500 a socket for chargers its guests can use. Checked on 2 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Solar for holiday parks, campsites and marinas

Where solar goes on leisure sites
Building or areaWhat uses powerNotes
Reception, shop, bar and restaurantLighting, tills, refrigeration, kitchensStandard-rated for VAT
Pools and leisure buildingsPumps, filtration, ventilation, lightingLarge roofs, high daytime use
Self-catering lodges and letsGuests' lighting, cooking, hot waterResidential for the VAT relief
Shower blocks and laundriesHot water, washers, dryers, lightingBusiest in the morning and through the season
Car parks and spare groundCanopies and ground arraysMore likely to need planning permission
Marina buildings and pontoonsChandlery, boatyard, offices, shore powerEquipment rated for coastal conditions

Seasonal use and summer peaks

Panels in the UK produce far more in summer than in winter, and most parks are busiest from spring to early autumn. That match is the reason solar suits leisure sites. Out of season, demand falls and more output is exported: worth knowing before sizing the system for August.

  • Size for the shoulder months as well as the peak. So the system isn't mostly exporting outside July and August
  • Look at the whole year's bills. Or twelve months of half-hourly data, to see the seasonal swing
  • Export. What you don't use can be sold under the Smart Export Guarantee in Great Britain
  • Batteries. Can move daytime output into the evening, when guests return

See half-hourly data and commercial battery storage.

Find out what your park's roofs and land could do: book a free site survey.

Book a free site survey

VAT: self-catering lets count as residential

HMRC's Notice 708/6 lists "self-catering holiday accommodation" among the residential accommodation covered by the zero rate for energy-saving materials, which includes solar panels and, since February 2024, batteries. It also covers static caravans used as a place of permanent habitation on a permanent residential park, while hotels, inns and similar establishments are standard-rated (Notice 708/6). The zero rate runs until 31 March 2027, then 5%. Ask for separate prices for lets and for the park's commercial buildings. More in VAT on solar panels.

Ground-mounted and carport options

Parks often have more ground than roof. A ground array on a spare field, or a canopy over parking, can be larger and better placed than panels spread across many small roofs. Both bring cable runs back to the main supply and usually planning permission, so the survey looks at distances and the electricity connection as well as the land.

EV charging for guests

Guests increasingly arrive in electric cars. The Workplace Charging Scheme, open until 31 March 2027, is open to small accommodation businesses, and for them there is no restriction on who may use the parking: customers, guests, visitors, staff or others. It covers up to 75% of the cost, capped at £500 per socket for installations completed from 1 April 2026, up to 40 sockets across your sites (Workplace Charging Scheme). Chargepoint equipment bought before April 2027 can also qualify for a 100% first-year allowance (GOV.UK).

See EV charging from solar.

Planning in rural and coastal areas

Many parks sit in or near protected landscapes. Rooftop panels are often permitted development within limits, but ground arrays and canopies are more likely to need permission, and National Parks and other protected areas bring extra rules. Our planning permission guide covers England, Scotland, Wales and Northern Ireland.

Sources

HMRC Notice 708/6, the Workplace Charging Scheme grant listing and GOV.UK first-year allowances were read on 2 November 2026.

General information, not tax advice.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Solar for holiday parks and campsites: FAQs

Is solar worth it for a holiday park?

Parks are busiest in spring and summer, which is when panels produce most, so the output lines up well with demand from reception, shops, bars, pools, laundry and the accommodation. Out of season, demand drops and more is exported. A survey looks at the park's own bills through the year to size the system.

Do holiday parks pay VAT on solar panels?

It depends on the building. HMRC's Notice 708/6 lists self-catering holiday accommodation as residential accommodation for the energy-saving materials relief, so installing panels or a battery on holiday lets and lodges can be zero-rated until 31 March 2027, then 5%. Panels on reception, a clubhouse, bar or shop are standard-rated, so ask the installer to price each separately.

Can holiday parks get a grant for EV chargers?

The Workplace Charging Scheme is open to small accommodation businesses until 31 March 2027, and for them there is no restriction on who may use the chargepoints, so guests can. It covers up to 75% of the cost, capped at £500 per socket for installations completed from 1 April 2026, up to 40 sockets across your sites.

Can a campsite or marina have solar?

Yes. Shower blocks, laundries, shops and workshops have roofs, and many sites have spare ground or parking areas for a ground array or canopy. Marinas often have chandleries, boatyards and offices as well as shore power for berths. Coastal sites need equipment rated for salt air.

Do we need planning permission on a rural or coastal site?

Rooftop panels on most buildings are often permitted development, within limits; ground arrays and canopies are more likely to need permission, and protected landscapes such as National Parks and areas of outstanding natural beauty bring extra rules. Our planning guide covers each nation.

Book a free site survey for your park

Tell us about the park, its buildings and land. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners