Guide for business owners

Grid Connection for Business Solar: Will the Network Let You Connect?

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

Almost every commercial solar system needs the local electricity network operator to agree to it. Up to 16 A per phase (3.68 kW single-phase, 11.04 kW three-phase) the installer connects and notifies; above that, the system normally needs an application under the rules called G99 first. Where the local network is full, export limitation often lets the system go ahead anyway. Your installer handles the paperwork. Checked on 2 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Will the grid let my business connect solar?

Usually, yes, though not always at the size or export you first want. The network operator owns the cables and substations that bring power to your site. Solar can push power the other way, so the operator checks the local network can take it.

The connection routes, in plain terms, checked 2 November 2026
SystemRouteWhat happens
Up to 16 A per phase in total (3.68 kW single-phase, 11.04 kW three-phase)G98Fully type-tested equipment; the installer connects and notifies the operator
Small systems a little over that, often export-limitedG99 fast trackA short application or notification, depending on the operator's criteria
Most commercial systemsG99Apply to the operator before installing; they may study the network and set conditions

The 16 A threshold is in the Energy Networks Association's G98 guidance (ENA), and National Grid Electricity Distribution says generation over 16 A (3.68 kW) per phase must comply with G99 (NGED). The detail of applications is the installer's job.

Who runs the network where your business is

Ofgem lists 14 electricity distribution network operators in Great Britain, owned by six groups (Ofgem). Each covers a fixed area. Northern Ireland has its own operator, NIE Networks.

Electricity network operators by area
AreaOperatorLicence areas
London, the South East and the East of EnglandUK Power NetworksLondon Power Networks, South Eastern Power Networks, Eastern Power Networks
The East and West Midlands, South Wales and the South WestNational Grid Electricity Distribution (formerly Western Power Distribution)East Midlands, West Midlands, South Wales, South West
The North East and YorkshireNorthern PowergridNortheast, Yorkshire
The North WestElectricity North WestElectricity North West
Central and southern Scotland; Merseyside, Cheshire and North WalesSP Energy NetworksSP Distribution, SP Manweb
The north of Scotland; central southern EnglandScottish and Southern Electricity Networks (SSEN)Scottish Hydro Electric Power Distribution, Southern Electric Power Distribution
Northern IrelandNIE NetworksOne operator for Northern Ireland, regulated separately from Great Britain

Boundaries don't follow county lines exactly, so check your site's postcode with the Energy Networks Association's look-up (ENA) or an operator's own tool (SSEN). The network operator is not your electricity supplier: you can change supplier, but not operator.

Find out what the network allows at your site: book a free site survey.

Book a free site survey

What the network operator checks

  • The size of the system. Its rated capacity, including any battery and anything already generating on site
  • How much it will export. Most businesses use much of their output, but the operator plans for the maximum export
  • The local network. Whether the cables, transformer and substation can take the extra power
  • The equipment. Type-tested inverters and protection that disconnect safely if the grid goes down

SSEN says that for generation of 50 kW or less you generally won't need to worry about network capacity constraints or reinforcement costs in most areas, and that for 50 kW or more it is worth checking its network map for constraints (SSEN). Operators publish capacity and opportunity maps; National Grid Electricity Distribution's is one example (NGED).

Export limits and zero export

If the operator says the network can't take the full export without costly or slow reinforcement, a business can limit its export instead. National Grid Electricity Distribution explains that an export limitation scheme measures the power at the site's connection and restricts generation or storage so the agreed export capacity is not exceeded. It must comply with the standard G100, be fail-safe, and bring export back under the limit within 5 seconds (NGED).

  • Export-limited. Generate as much as you like, export up to an agreed figure
  • Zero export. Generate up to what the site is using, export nothing
  • When it suits. Businesses that use most of their output in the day, which is most of the businesses that suit solar
  • The cost. Some output may be curtailed on quiet days; a battery can store it instead

Export earns less than the electricity it replaces on site in most cases: see the Smart Export Guarantee.

Timescales

There is no single answer. Small systems on the fast track routes move quickly; larger systems that need a network study, an offer and possibly reinforcement take longer, and each operator publishes its own process and timescales. In Northern Ireland, NIE Networks runs its own versions of the rules, G98/NI and G99/NI (NIE Networks). Ask your installer to check the capacity map for your area at the survey, and to give you the operator's current timescale before you sign.

Batteries and grid limits

A battery counts towards the capacity the operator looks at, but it can also help when export is limited: it stores output the site can't use at midday instead of curtailing it. The connection application covers the solar and the battery together. See commercial battery storage and system sizes, where the rules change by size.

Sources

Ofgem, the ENA G98 guidance and the NGED, SSEN and NIE Networks pages were read on 2 November 2026. Check your postcode with the ENA look-up.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Grid connection for business solar: FAQs

Does my business need the network operator's approval for solar?

For almost any commercial system, yes. Small systems of up to 16 A per phase (3.68 kW on a single-phase supply, 11.04 kW on three-phase) connect under the rules called G98 and the installer notifies the network operator. Anything larger connects under G99, which normally means applying to the network operator before installation. The installer handles the paperwork; the answer can affect the size of system you can export from.

Who is my electricity network operator?

It depends on where the site is. Ofgem lists 14 distribution network operators in Great Britain, owned by six groups: UK Power Networks, National Grid Electricity Distribution, Northern Powergrid, Electricity North West, SP Energy Networks and Scottish and Southern Electricity Networks. Northern Ireland's is NIE Networks. The Energy Networks Association's look-up finds yours from a postcode. It is not your electricity supplier.

What is export limitation?

A control that stops the system sending more than an agreed amount to the grid. National Grid Electricity Distribution describes it as an option for customers who are told an increase in export capacity would need costly or slow reinforcement: the business restricts its export rather than wait for or pay towards the upgrade. The scheme must meet the standard G100 and cut export back within 5 seconds.

What is zero export solar?

Export limitation set to zero, or close to it: the system can generate as much as the site uses, but sends nothing to the grid. It suits businesses that use most of the output on site anyway, and can make a connection possible where the local network is full.

How long does grid approval take?

It varies by network operator, by the size of the system and by how busy the local network is, so there is no single answer. Small systems that fit the fast track routes are quicker; larger systems that need a study or reinforcement take longer. Your installer can check the operator's capacity map and published timescales before you commit.

Book a free site survey

Tell us about the business and the site. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners