Guide for business owners

Solar EV Charging for Businesses: Charge Your Fleet From Your Own Roof

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

Electric vans and staff cars parked through the working day can charge from the panels on your roof or car park, replacing electricity you would otherwise buy. The chargers have their own support: the Workplace Charging Scheme pays up to 75% of the cost, capped at £500 per socket, until 31 March 2027, and charging equipment can qualify for a 100% first-year allowance. Checked on GOV.UK on 2 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Charging fleet and staff cars from your own solar

Vehicles are the most flexible load a business has. A van parked from 9 to 5, or a pool car between jobs, can take power whenever the panels produce it. That makes EV charging a good partner for solar: midday output that the building can't use goes into vehicles instead of being exported.

  • Daytime charging. Fleets back at the depot at midday, staff cars parked all day, pool cars
  • Smart chargers. Can follow solar output, charging faster when panels are producing
  • Overnight charging. Needs grid power, or a battery filled by the panels during the day
  • Customer charging. Brings its own rules and, at most businesses, is outside the grant

How much charging solar can cover

That depends on the size of the array, where you are and how much of its output the building already uses. On PVGIS figures, each kW of panels facing south at 35 degrees produces roughly 850 to 1,120 kWh a year across the UK, about two thirds of it from April to September (PVGIS). Summer charging is well covered; winter charging much less.

Example only

A 40 kW solar carport in Birmingham

  • PVGIS: about 875 kWh per kW a year at a 10° tilt, typical for a canopy
  • 40 kW × 875 = about 35,000 kWh a year
  • Spread unevenly: far more in June than in December
  • How much of that goes into vehicles depends on when they are parked and what the building uses at the same time

Example only. Your installer models it from your site, your half-hourly data and your fleet's pattern.

See solar output in the UK and half-hourly data.

Plan solar and charging together for your site: book a free site survey.

Book a free site survey

The Workplace Charging Scheme

Workplace Charging Scheme, checked on GOV.UK on 2 November 2026
The rule
Open until31 March 2027, extended for a final year
GrantUp to 75% of purchase and installation costs (including VAT)
Cap£500 per socket for installations completed from 1 April 2026; £350 before
SocketsUp to 40 across all your sites
Who can applyBusinesses, charities, public sector organisations, small accommodation businesses
Who can use themAt a business, staff or fleet only (residents may use them outside working hours); no restriction for public authorities, charities and small accommodation businesses
WhereEngland, Wales, Scotland and Northern Ireland
PropertyYou must own it or have the landlord's consent, with off-road parking designated to you

Sources: Find a grant, GOV.UK changes from 1 April 2026, guidance for applicants. State-funded education institutions have a separate, higher rate. The grant pays towards chargers, not solar panels.

Capital allowances on chargers and cars

GOV.UK says that if you buy them new and unused before April 2027, you can claim 100% first-year allowances on equipment for electric vehicle charging points and on electric cars and cars with zero CO2 emissions (GOV.UK). Solar panels are different: they are special rate expenditure, covered in our guide to capital allowances on solar panels.

Carports and canopies

A solar carport generates power over the very spaces where vehicles charge, shelters them, and adds generation where the roof is small or unsuitable. It is a structural and planning job, so the survey looks at foundations, layout and planning before design. Car dealerships, depots, retail parks and holiday parks often have the space: see dealerships and garages, retail and holiday parks.

Batteries and charging after dark

Vehicles that come back in the evening miss the solar output. A battery can store the midday surplus for them, but it adds cost, so it is worth modelling against your fleet's real pattern. Chargers and solar together also change what the site draws from and sends to the grid, which the network operator looks at: see commercial battery storage and grid connection.

Sources

The Workplace Charging Scheme listing and GOV.UK guidance, GOV.UK first-year allowances and PVGIS 5.3 were read or queried on 2 November 2026. The scheme ends on 31 March 2027.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Solar EV charging for businesses: FAQs

Is there a grant for EV chargers for businesses?

Yes, the Workplace Charging Scheme, extended for a final year until 31 March 2027. It covers up to 75% of the cost of buying and installing chargepoints, capped at £500 per socket for installations completed from 1 April 2026 (£350 before), up to 40 sockets across all your sites. It is open to businesses, charities, public sector organisations and small accommodation businesses in England, Wales, Scotland and Northern Ireland.

Can customers use chargers funded by the Workplace Charging Scheme?

Not at an ordinary business: the scheme requires the chargepoints to be for staff or fleet use, though local residents may use them outside working hours. Public authorities, charities and small accommodation businesses have no restriction, so customers, guests and visitors can use them. Chargepoints open to the public must follow the Public Chargepoint Regulations 2023.

Can solar panels charge our electric vehicles?

Yes, in daylight. Solar output used to charge vehicles on site replaces electricity you would otherwise buy. It suits fleets and staff cars that are parked during the working day. Cars that charge overnight need grid power or a battery.

Can we claim capital allowances on EV chargers?

GOV.UK says equipment for electric vehicle charging points bought new before April 2027 can qualify for a 100% first-year allowance, as can new electric and zero-emission cars. Solar panels themselves are special rate expenditure with their own rules.

Should the chargers and the solar be installed together?

It often makes sense to plan them together: the electricity supply, the network operator's approval and the cable routes are shared, and a solar carport puts generation right next to the chargers. They can be installed at different times if the design allows for both.

Book a free site survey

Tell us about the business, the site and the vehicles you charge. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners