Smart Export Guarantee for Businesses: Getting Paid for Exported Solar

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

Yes, a business in Great Britain can be paid for solar it exports, under the Smart Export Guarantee. Ofgem says solar of up to 5 MW is eligible, suppliers set the rate (always above zero), and you need a half-hourly export meter. But exported power is usually worth far less than power you use yourself, so the SEG is a bonus on top of self-use, not the reason to install. Checked against Ofgem on 2 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Can a business get paid for exporting solar?

The SEG launched on 1 January 2020. It requires some electricity suppliers, SEG licensees, to pay small-scale low-carbon generators for electricity they export back to the grid (Ofgem). It is not just for homes: eligibility depends on the technology and size of the installation, and businesses, farms and public bodies with solar can all apply. Solar PV, wind, hydro, anaerobic digestion and micro-CHP are the eligible technologies (Ofgem).

SEG eligibility for business systems

SEG eligibility for solar PV, from Ofgem (checked 2 November 2026)
Rule
LocationGreat Britain only, not Northern Ireland
SizeTotal installed capacity up to 5 MW; above that, export deals are commercial contracts outside the SEG
Up to 50 kWInstallation and installer suitably certified, for example an MCS certificate, or accreditation to EN 45011 or EN ISO/IEC 17065:2012
50 kW to 5 MWInstallation suitably certified; no installer certification requirement; the SEG licensee decides what evidence it needs
MeteringA meter capable of half-hourly measurement with an export MPAN, at the point of connection
RateSet by the SEG licensee; must always be above zero

Sources: Ofgem, Ofgem generators, SEG Guidance for Generators. If a SEG licensee can't be shown the installation is suitably certified, it is not obliged to pay under the SEG, though it may choose to.

Size your system to your own use, with export as a bonus: book a free site survey.

Book a free site survey

Choosing a SEG tariff

  • Shop around. Ofgem publishes the list of SEG licensees and advises comparing tariffs
  • Any licensee. SEG licensees must offer a tariff to all eligible generators, so you can look beyond the supplier you buy from; check each offer's terms
  • Who must offer one. Suppliers with at least 150,000 domestic customers must offer at least one SEG compliant tariff; others may do so voluntarily
  • Fixed or variable. Rates and contract lengths vary; check how and when the rate can change
  • Meter readings. Payments are based on export meter readings, so check how the licensee will take them

Export limits from the network

The network operator may cap how much the site can export, especially for larger systems in areas where the local network is full. An export-limited or zero export system still saves money on everything it supplies on site; it just earns less, or nothing, from the SEG. See grid connection and export limits.

Why using it yourself is usually worth more

Every unit your panels supply on site replaces a unit bought at your full delivered price: energy, network charges, policy costs and the Climate Change Levy. Across UK businesses that averaged 24.5p per kWh in April to June 2026, including the levy and excluding VAT, on government figures (DESNZ). Export tariffs are set by suppliers and are usually far below that.

Example only

How to compare self-use and export

  • Value of a unit used on site = what you pay per kWh on your contract (for example, the 24.5p business average)
  • Value of a unit exported = your SEG tariff per kWh (check your own offer)
  • Every unit moved from export to self-use is worth the difference between the two
  • So size the system to your daytime use, and treat export as a bonus on the surplus

Use your own contract price and the SEG offer you are given. We don't quote SEG rates because suppliers set and change them.

See how much solar you need, batteries (which shift surplus to later in the day) and business electricity prices.

Sources

Ofgem's SEG pages and the SEG Guidance for Generators, and DESNZ QEP 3.4.2 (published 29 September 2026), were read on 2 November 2026.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Smart Export Guarantee for businesses: FAQs

Can a business get paid for exporting solar electricity?

Yes, in Great Britain, under the Smart Export Guarantee. Ofgem says solar PV installations of up to 5 MW total installed capacity are eligible, and SEG licensees (suppliers offering a SEG tariff) must offer a tariff to all eligible generators. The supplier sets the rate and contract length, and the rate must always be above zero.

Does a business solar system need MCS to get the SEG?

Up to 50 kW, Ofgem's guidance says you will be asked to show that the installation and the installer are suitably certified, for example with an MCS certificate, or accreditation to an equivalent standard. Between 50 kW and 5 MW, the installation must be certified but there is no installer certification requirement; the SEG licensee decides how it satisfies itself.

What meter do I need for the SEG?

Ofgem's guidance says exports must be metered by a meter capable of taking half-hourly measurements, with an export MPAN, located where the installation connects to the network. Your existing meter may be able to measure exports; ask your SEG licensee.

Which suppliers have to offer a SEG tariff?

Ofgem's guidance says licensed suppliers with at least 150,000 domestic electricity customers must offer at least one SEG compliant tariff; others may take part voluntarily. You don't have to take the SEG from the supplier you buy electricity from. Ofgem publishes the list of SEG licensees and says to shop around.

Does the SEG apply in Northern Ireland?

No. Ofgem says installations must be located in Great Britain.

Is it better to export solar or use it?

For most businesses, use it. Every unit used on site replaces one you would buy at your full contract price, which averaged 24.5p per kWh across UK businesses in April to June 2026 on government figures. Export tariffs are set by suppliers and are usually well below what businesses pay to buy. That is why installers size commercial systems to the daytime load.

Book a free site survey

Tell us about the business and the site. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners