Solar for drinks producers

Solar Panels for Breweries, Distilleries and Vineyards

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

The short answer: refrigeration is usually a brewery's biggest electricity user, and it runs every day, through warm afternoons, which makes breweries a good match for solar. Pumps, milling, bottling and canning add to it. The limit is heat: boiling wort and running stills usually take steam or direct firing, which panels don't provide. Rural sites often have the space for a ground array. Checked on 3 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Solar for breweries, distilleries and vineyards

Drinks producers and how they suit solar
SiteElectric loads in daylightWhat to check
BreweryFermentation and conditioning cooling, pumps, packaging, cold storeRoof over production, how the brewhouse is heated
DistilleryMilling, pumps, cooling water, bottling, warehouse lightingHeat source for the stills, fire zoning near spirit stores
Vineyard and wineryPressing and pumping at harvest, tank cooling, shop and tasting roomAutumn peak against summer output, ground space
Cider and soft drinksPressing, pumping, chilling, bottlingSeasonal production, cold storage

The same survey decides all of them: how much of the output you would use, and where panels can go. Bigger food and drink manufacturing sites: solar for food and drink.

Cooling, pumping and bottling loads

The IFC's guidelines for breweries describe the energy profile (IFC): breweries are relatively intensive users of both electrical and thermal energy. Thermal energy raises steam in boilers, used largely for wort boiling and water heating in the brewhouse and in the bottling hall. The process refrigeration system is typically the largest single consumer of electrical energy, but the brewhouse, bottling hall and waste water treatment plant can also account for substantial electricity demand.

  • Refrigeration. Fermenters, conditioning tanks and cold rooms are cooled every day. Demand rises in warm weather, when panels produce most.
  • Efficiency first. The IFC says raising the refrigeration system's evaporating temperature by 1 K cuts its electricity use by roughly 3 to 4 percent, so set temperatures and maintenance come before sizing panels.
  • Pumps and compressed air. Transfers, cleaning in place and packaging lines run on pumps and air. The IFC says cutting compressed air pressure from 8 bar to 7 bar should reduce its electricity use by about 7 percent.
  • Packaging days. Bottling and canning are heavy, but often on set days: schedule them for daylight where you can.

What solar can't do: brewing and distilling heat

Solar panels make electricity. In most breweries the wort is boiled with steam from a boiler (IFC), and in most distilleries the stills are heated by steam or direct firing. Unless that heat is electric, solar does nothing for it. Be wary of any quote that counts savings on gas.

Where a site has, or is moving to, electric heating, such as electric hot liquor tanks, heat pumps or an electric steam boiler, a larger solar system starts to make sense, often with a battery. Size it to the electric loads you have now and leave room to extend.

We match breweries, distilleries and vineyards with one MCS certified installer that covers their area. The survey is free.

Book a free site survey

Rural sites and ground-mounted arrays

Many breweries, distilleries and wineries sit in the countryside with land around them. A ground array avoids roofs over production and spirit stores, but in England stand-alone panels at a non-domestic site are permitted only up to 9 square metres (Class K), so a business-scale array needs planning permission.

  • The grid. Rural networks can limit export; a system sized to your own use is less affected.
  • Cable runs. Distance from the array to the main switchboard adds cost.
  • Roofs over production. Panels over brewing, fermentation or a bonded warehouse need fire and access planning. RC62, the insurers' recommendations for PV, is the document insurers refer to.

Sources: Class K, RC62. More: ground-mounted solar, grid connection and fire risk and insurance.

Seasonal peaks and the harvest

Output per kW, south-facing at 35 degrees, Birmingham (PVGIS)
MonthkWh per kW
June117
August106
September90
October63
December33

Source: PVGIS. A brewery busiest through the summer lines up well with solar. A winery busiest at the autumn harvest gets less from the panels just when it needs most; summer cooling and a tasting room or shop use the summer output. A battery or simply sizing for the summer base load are the usual answers.

Paying for it

Electricity you generate and use yourself avoids the price you would pay for it, and HMRC says an auto-generator need not account for the Climate Change Levy on self supplies of renewable electricity (CCL1/3). A business that buys the system can usually claim capital allowances. Vineyards that are farm businesses should check farm solar grants. More: the Climate Change Levy, capital allowances and payback.

Sources

IFC guidelines, PVGIS and HMRC's CCL1/3 read on 3 November 2026; the GPDO Class K and RC62 on 2 November 2026. The IFC guidelines are international; your own half-hourly data shows your site's real profile.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Solar for breweries, distilleries and vineyards: FAQs

Is solar worth it for a brewery?

Often, because a brewery's biggest electricity user runs through the day. The IFC's brewery guidelines say the process refrigeration system is typically the largest single consumer of electrical energy, with the brewhouse, bottling hall and waste water plant also using substantial electricity. Fermentation and conditioning keep cooling running every day, including warm afternoons when panels produce most.

Can solar heat the brew kettle or the stills?

Not directly. Solar panels make electricity. In most breweries and distilleries the heat for boiling wort or running the stills comes from steam or direct firing, usually from gas or oil, and panels don't change that unless the heating is electric. Solar pays its way on the electrical loads: cooling, pumps, milling, packaging and lighting.

Does solar suit a vineyard and winery?

It can, but the timing needs thought. The busiest weeks in a winery are around the autumn harvest, when output is lower than in summer: in Birmingham, PVGIS gives a south-facing panel about 90 kWh per kW in September and 63 in October, against about 117 in June. Cooling, pumping and a shop or tasting room through the summer use the summer output well.

Can a rural brewery or distillery put solar on the ground?

Yes, if it has the land, but a business-scale ground array needs planning permission: in England, permitted development for stand-alone panels at a non-domestic site stops at 9 square metres. The grid connection at a rural site can also limit how much you can export, which matters less if the system is sized to your own use.

Do we pay the Climate Change Levy on our own solar power?

No. HMRC says that where you are an auto-generator there is no requirement to account for the Climate Change Levy on self supplies of renewable source electricity. The levy is charged on the electricity you buy.

Book a free site survey

Tell us about the site and the production. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners