Solar for small businesses

Solar Panels for Small Businesses: Shops, Units, Workshops and Practices

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

The short answer: a small business can do well from solar, because small users pay the most for each unit of electricity: about 38.4p per kWh for the smallest business users in April to June 2026, against a 24.5p average (DESNZ, provisional). The things to check are how much of your use falls in daylight, whether your landlord agrees if you rent, and what your electricity supply can take. Checked on 3 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

Is solar worth it for a small business?

The price you pay for each kWh sets what each kWh of solar saves. Smaller users pay more (DESNZ):

Business electricity prices by annual use, April to June 2026, pence per kWh including CCL, excluding VAT (DESNZ, provisional)
Annual usePrice per kWh
Up to 20 MWh (very small)38.4p
20 to 499 MWh (small)28.6p
All business users (average)24.5p
  • Good fits. Shops with chillers and lighting open through the day, workshops with tools and compressors, offices, salons, practices and small food businesses.
  • Harder fits. Businesses that use most of their power in the evening or overnight, such as a takeaway that opens at five. A battery can help, at extra cost.
  • The test. Whether you would use most of what the panels make. Twelve months of bills, or half-hourly data if you have it, answers that.

More: commercial solar payback and cutting business energy costs.

Small systems: what 10 to 30 kW does

PVGIS, the European Commission's solar tool, gives about 968 kWh a year for each kW of panels facing south at 35 degrees in Birmingham (PVGIS). Further north it is less, further south more, and east-west roofs make less per kW.

Example only

What a small system makes in a year, Birmingham, south at 35 degrees

  • 10 kW: about 9,700 kWh
  • 20 kW: about 19,400 kWh
  • 30 kW: about 29,000 kWh
  • Compare that with your annual use on your bills.

PVGIS estimates with 14% system losses. Your survey uses your own roof, angle and shading.

If a 10 kW system would make more than you use in daylight, the extra is exported at an export tariff, worth much less than what you pay. Size to your use, not your roof. See commercial solar system sizes and how much solar you need.

Small sites get the same free survey. We match you with one MCS certified installer that covers your area and the size of job.

Book a free site survey

Renting your premises

Most small businesses rent. Solar is still possible, with a few things agreed in writing first:

  • Landlord consent. Written consent for the installation. Grant schemes ask for it too (Three Rivers District Council's grant does, for example).
  • Who owns the panels. Whether they stay yours, pass to the landlord, or are removed if you leave.
  • The lease length. How long is left, against how long the system takes to pay back.
  • Repairs and the roof. Who maintains the panels and what happens when the roof needs work.

Source: Three Rivers District Council. Lease clauses and green leases in detail: solar on a leased building.

Single-phase and three-phase supplies

Smaller premises sometimes have a single-phase supply, like a house. That decides the connection route (ENA, NIE Networks):

Connection routes by supply
SupplyUp to 16 A per phase (G98)Above that
Single-phase3.68 kW: the installer connects and notifiesG99: apply to the network operator first
Three-phase11.04 kW: the installer connects and notifiesG99: apply to the network operator first

A bigger system on a single-phase supply may be allowed with an export limit, or the supply can be upgraded through the network operator. The survey checks your supply and fuse rating. More: grid connection for business solar.

Paying for it

  • Cash and tax relief. The Annual Investment Allowance lets a business deduct up to £1 million a year of qualifying spending from its profits (GOV.UK). See capital allowances.
  • Green loans. The British Business Bank says green loans from banks and other lenders typically fund things like renewable energy and green buildings, and advises shopping around and getting independent financial advice (British Business Bank).
  • Leasing or hire purchase. Spread the cost over the system's early years; who owns the panels differs between them. See paying for commercial solar.
  • Local grants. A few councils have open grants, such as Three Rivers in Hertfordshire. See solar panel grants for businesses.

You are in good company: in the British Business Bank's 2025 survey, 29% of medium-sized businesses had already installed on-site renewable energy and 13% planned to (SMEs and Net Zero 2025).

Sources

DESNZ table 3.4.2, PVGIS, NIE Networks, the British Business Bank and Three Rivers pages read on 3 November 2026; the ENA guidance on 2 November 2026.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Solar for small businesses: FAQs

Are solar panels worth it for a small business?

They can be, if you use most of your electricity in daylight. Small users pay more per unit: DESNZ's provisional figures for April to June 2026 put the smallest business users (up to 20 MWh a year) at about 38.4p per kWh including the Climate Change Levy, against a 24.5p average. Every kWh of solar you use yourself saves that price. If most of your use is in the evening or at night, the case is weaker.

What size solar system does a small business need?

Usually something between 10 and 30 kW for a shop, small unit or practice, but it depends on your daytime use, not the size of the roof. As a guide, PVGIS gives about 968 kWh a year for each kW of south-facing panels in Birmingham, so 10 kW makes around 9,700 kWh a year there. A survey sizes it from your own bills or half-hourly data.

Can I have solar if I rent my premises?

Yes, with your landlord's written consent, and it helps to agree in writing who owns the panels, who maintains them and what happens if you leave. Grant schemes ask for it too: Three Rivers District Council's business solar grant, for example, requires landlord consent if you rent.

Does a single-phase supply limit solar?

It changes the paperwork more than the possibility. Up to 16 A per phase (3.68 kW on single-phase) the system connects under G98 and the installer notifies the network operator. Larger systems connect under G99, which normally means applying first, and the operator may set an export limit. Some sites upgrade to three-phase; the survey checks what you have.

How can a small business pay for solar?

Cash with capital allowances (the Annual Investment Allowance covers up to £1 million of qualifying spending a year), a green loan from a bank, leasing or hire purchase, or a local grant where one is open. The British Business Bank's guide says green loans to SMEs are typically for things like renewable energy and green buildings, and advises shopping around.

Book a free site survey

Tell us about the business and the premises. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners