Solar for equestrian businesses

Solar Panels for Stables, Livery Yards and Equestrian Centres

1 of 10
  • The best option for your business
  • One vetted MCS installer
  • A free site survey

What kind of survey would you like?

Six quick taps, then where to reach you.

The short answer: an equestrian business with daytime loads, such as horse walkers, solariums, water heating and yard lighting, can use a lot of what solar makes, and stable blocks and arena buildings give long roofs to put it on. The catch is the arena lights: winter evenings are when you need them and when panels make nothing. Fire safety, roof condition and working around the horses are the other things the survey has to get right. Checked on 3 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

What uses power at a yard, and when

The Valuation Office lists the facilities that come with equestrian properties: horse walkers, outdoor and indoor arenas, jump paddocks, wash-down facilities, solariums, storage, offices and tack rooms (VOA). Here is how they line up with solar:

Typical equestrian loads and how they suit solar
LoadWhen it runsFit with solar
Horse walkerThrough the working dayGood
Solarium (heat lamps)After exercise and washing, mostly in daylightGood
Water heating for wash-downsThrough the day; electric heaters can be timedGood, if electric
Yard, barn and tack room lightingEarly mornings and evenings in winterPartial
Arena floodlightsWinter evenings, after school and workPoor without a battery
Office, clippers, fridges, electric fencingAll dayGood, but small

Lighting, water heating and arenas

Solar output follows the seasons. PVGIS gives a south-facing panel in Birmingham about 33 kWh per kW in December against about 117 in June (PVGIS), and none at all after dark. A yard whose biggest bill is floodlights on winter evenings will use little of its solar directly.

  • Move what you can into the day. Run the horse walker, wash-down heaters and charging while the panels are producing.
  • Cut the lighting load first. LED floodlights and timers reduce what the panels or a battery need to cover.
  • Consider a battery. It stores midday output for the evening. Whether it pays depends on how much summer and spring output you would otherwise export.

See commercial battery storage and how much electricity solar produces.

Stable roofs and outbuildings

Stable blocks, barns and indoor arenas often have long, simple roofs. What decides whether they can take panels:

  • Structure. The MCS standard requires the roof structure to be checked for the loads, and a structural engineer where it is unusual, altered or in doubt (MIS 3002).
  • Roof material and fire. The British Horse Society notes that brick and tile stables behave better in a fire, while wood and felt or corrugated roofing burns and deforms quickly. Panels over horses need careful design and an insurer's view.
  • Asbestos. Older fibre cement sheeting may contain asbestos and can't simply be drilled. See our guide to asbestos cement roofs.
  • The ground. A ground array beside the yard keeps panels off older roofs and away from the horses, but needs planning permission at business size.

Sources: MCS, British Horse Society. More: asbestos roofs, fire risk and insurance and ground-mounted solar.

We match yards and equestrian centres with one MCS certified installer that covers their area. The survey is free.

Book a free site survey

Horses, fire safety and installation work

  • Plan the work around the yard. Agree which boxes, paddocks and walkways are out of use while scaffolding goes up and panels are lifted, and keep vehicles away from turnout.
  • Noise and movement. Scaffolding and roof work are noisy; move nervous horses to quieter boxes or turn them out away from the work.
  • Cables and kit. Inverters, isolators and cable runs well out of reach of horses and rodents, and away from hay and bedding.
  • Fire risk assessment. The British Horse Society says the Regulatory Reform (Fire Safety) Order 2005 applies to stables where people work, livery yards and equestrian centres, so a business must carry out a fire risk assessment. Update it for the new installation.
  • Electrics checked. The BHS recommends electrics are tested at least once a year by a qualified electrician, and flags circuits that have been added to as a fire risk. Ask for the solar to be included.

Source: British Horse Society, Stable fire safety.

Business rates and planning

Rates. The Valuation Office says almost all non-domestic properties are liable for business rates, private stables usually included, and that reliefs mean most private stables don't pay any (VOA). Either way, in England plant used to generate power mainly from renewable sources is left out of the rating valuation until 31 March 2035 (SI 2022/405), with matching rules in Wales and Scotland. See solar panels and business rates.

Planning. In England, panels on a non-domestic building such as a stable block or arena are permitted development within height and edge limits, with prior approval over 50 kW (Class J). Stand-alone panels are limited to 9 square metres (Class K), so a paddock array needs an application. See planning permission.

Paying for it

An equestrian business that buys a system can usually claim capital allowances against its profits; see capital allowances. A yard that is part of a farm business should also check farm solar grants, and every business local grants by area. Loans and leasing: paying for commercial solar.

Sources

Valuation Office, British Horse Society, MCS and PVGIS read on 3 November 2026; the rating and planning orders on 2 November 2026.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

Solar for stables and equestrian centres: FAQs

Are solar panels worth it for stables or a livery yard?

For a yard that uses power in the day, often. The Valuation Office lists the facilities equestrian properties have, including horse walkers, indoor and outdoor arenas, wash-down areas, solariums, tack rooms and offices. Horse walkers, solariums, water heating and the yard's daytime lighting suit solar. Arena floodlights used on winter evenings don't, unless you add a battery.

Can solar panels go on a stable block roof?

Often, if the roof structure can take the load and the roofing is sound. The MCS standard requires the roof structure to be checked, with a structural engineer where there is any doubt. Many older stable roofs are timber, felt or corrugated sheeting, which the British Horse Society notes burn and deform quickly in a fire, so roof material and fire safety are part of the survey.

Will installing solar upset the horses?

It needs planning, not avoiding. Agree which boxes and paddocks are used while scaffolding goes up and panels are lifted, keep machinery and deliveries away from turnout and walkways, and make sure cables are protected and out of reach. A good installer will work to your yard routine.

Do solar panels on stables increase business rates?

Not at present in England, Wales or Scotland: renewable generating plant is left out of the rating valuation until 31 March 2035. The Valuation Office says almost all non-domestic properties, stables included, are liable for business rates, though reliefs mean most private stables don't pay business rates at all.

Do I need planning permission for solar at an equestrian centre?

Panels on the roof of a stable block or arena building are usually permitted development in England under Class J, within height and edge limits, with prior approval for systems over 50 kW. A ground array in a paddock larger than 9 square metres needs a planning application. Stables next to a house can have different rules, so check at the survey.

Book a free site survey

Tell us about the yard and the buildings. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners