The short answer: survey, design and quote, permissions, the grid application, then installation, testing and handover. The roof work is usually the quickest part; the grid application and any planning decide most of the timetable. As the business, you also have legal duties as a commercial client for the building work. Here is each step, what you need ready and what you should get at the end. Checked on 3 November 2026.

Free site survey: we match you with one MCS certified installer who covers your area and the size of the job. Your details go to that installer only, so you're not passed around or ring-rounded.

  • 130+ UK installers
  • MCS certified only
  • Free survey, no obligation
  • One installer, not a list of callers

From enquiry to switch-on

The steps of a commercial solar installation
StepWhat happensWhat matters
1. Enquiry and callYou tell us about the site; we call to go through the checksYour energy use, roof or land, who owns the building
2. Site surveyThe installer we match you with visits (or starts with a video call)Roof, structure, electrics, space for kit, shading, access
3. Design and quoteSystem size, layout, expected output and priceTwelve months of half-hourly data or bills
4. PermissionsPlanning or prior approval where needed; landlord consent if you rentListed status, conservation area, lease terms
5. Grid applicationThe installer applies to the network operator for most commercial systemsThe answer may set an export limit
6. Contract and planning the workProgramme, access, health and safety arrangementsYour duties as a commercial client
7. InstallationScaffolding or edge protection, mounting, panels, cabling, invertersShort shutdown for the final connection
8. Commissioning and handoverTesting, paperwork, monitoring set upCertificates and the handover pack

We handle step 1 and match you with one MCS certified installer for the rest. The order can overlap: an installer often applies to the network operator while planning is being decided.

Survey and design

The survey decides whether the system can be built safely and what size makes sense. Under the MCS standard (MIS 3002):

  • The roof structure. is checked by a competent person to make sure it can take the system's loads; a qualified structural engineer is consulted where the roof is unusual or there is any doubt.
  • Weather tightness. The system must not affect the building's weather tightness or structural integrity for its life.
  • Roof warranties. If the roof covering is under warranty, the warranty provider should be consulted first.
  • Risk assessments. Suitable and sufficient risk assessments are done before work on site starts.

The design then sizes the system to your daytime use, from a year of half-hourly data. What the visit covers in detail: the commercial solar site survey.

Step 1 is a short call and a free survey. We match you with one MCS certified installer that covers your area.

Book a free site survey

Permissions and grid approval

Planning. Rooftop solar on a business building is often permitted development. In England, systems over 50 kW need the council's prior approval first; work can start when the council says approval isn't needed, grants it, or 56 days pass without a decision (Class J, J.4). Listed buildings always need consent. See planning permission and listed buildings.

The grid. Systems up to 16 A per phase connect under G98 and the installer notifies the network operator; larger systems connect under G99, which normally means applying before installation (ENA). The operator may agree, ask for changes, or set an export limit. This is often the longest wait. See grid connection for business solar.

Your landlord. If you rent, get written consent before you commit. See solar on a leased building.

Your duties as a commercial client

The Construction (Design and Management) Regulations 2015 apply to solar installations. HSE says a commercial client is any individual or organisation that carries out a construction project as part of a business, and client duties apply to them in full (HSE). For every project, a commercial client must:

  • Arrange the project properly. Make suitable arrangements for managing it, including appointing the other dutyholders and allowing enough time and resources.
  • Share information. Provide the information the designers and contractors need, such as asbestos surveys, drawings and site rules.
  • Check the others do their part. Make sure the principal designer and principal contractor carry out their duties, and that welfare facilities are provided.
  • Notify larger projects. Notify HSE where the work will last longer than 30 working days and involve more than 20 workers at any one time, or exceed 500 individual worker days.

A good installer will walk you through this and do most of the paperwork, but the duties stay with the business (HSE summary). On older roofs, ask about asbestos before anyone goes up: solar on an asbestos cement roof.

Installation days and disruption

  • Access and edge protection. Scaffolding or edge protection goes up first; plan where it stands, where deliveries land and which entrances stay open.
  • Roof work. Mounting, panels and cabling happen on the roof, mostly out of the way of day-to-day work.
  • Inside the building. Inverters, isolators and cable runs to the distribution board; agree the routes and where the kit lives.
  • The connection. Connecting to your electrics needs a short shutdown of the circuits affected. Ask for it to be scheduled outside your busiest hours.
  • People and vehicles. Keep staff, customers and vehicles clear of the work areas; agree no-go zones in the plan.

Testing, handover and paperwork

The MCS standard covers systems up to a DC output of 50 kWp. It requires the system to be commissioned to a documented procedure and inspected and tested, and its model handover document includes (MIS 3002):

  • A verification certificate. Signed by the people responsible for design, installation and testing, with the key components, rated power (kW DC) and estimated system performance.
  • Test and inspection reports. For the electrical installation and the PV array.
  • The next inspection. When the next inspection is recommended.
  • Building regulations. Notification completed before handover, where the installer is responsible for it.

MCS says certification is a requirement for many UK government incentives (MCS), such as getting paid for exports under the Smart Export Guarantee. After switch-on: maintenance and insurance.

Sources

MCS MIS 3002 (2025) and HSE's CDM 2015 pages read on 3 November 2026; the ENA guidance and the GPDO Class J on 2 November 2026.

Matching

How we choose your installer

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

  1. 1

    We talk to you about the site and how the business uses electricity.

  2. 2

    Installers who cover your area see the project without your name or contact details.

  3. 3

    Our team picks the one best placed for it, by area, the size of the job and MCS certification.

  4. 4

    Only that installer gets your details, and they book the survey with you.

  5. 5

    Not right for you? Tell us.

What we check before we match you

  • MCS certification: current, and on the MCS installer register.
  • Other accreditations they hold, for example NICEIC or NAPIT, RECC and TrustMark. We favour installers with more relevant accreditations.
  • Their customer reviews on public review sites.
  • How long they have been trading, and that the company is active at Companies House with its accounts filed.
  • Stability: no frequent changes of directors in recent years.
  • That they cover your area and do jobs of your size.

If an installer doesn't meet these, we don't match them.

Four steps

What happens next

Book a free site survey and we match your site with one MCS certified installer that covers your area and the size of job. Four steps from a short call to a survey at your site.

  1. 1

    Book a call

    Fill in the short form. A member of our UK team calls you to ask about the site and how the business uses electricity.

  2. 2

    We check it's a fit

    Ownership or landlord consent, your energy spend, the roof or land and your electricity supply, so nobody's time is wasted.

  3. 3

    Matched with one installer

    Installers who cover your area see the project without your name or contact details. Our team picks the one best placed for it, and only they get your details.

  4. 4

    Your free site survey

    The installer visits at a time that suits you, looks at the site and gives you their proposal. Whether you go ahead is up to you.

Questions

The installation process: FAQs

What are the steps in a commercial solar installation?

Survey, design and quote, permissions (planning or prior approval where needed, and landlord consent if you rent), the grid application to the network operator, planning the work under the construction safety rules, the installation itself, then commissioning, testing and handover with the certificates and documents.

How long does a commercial solar installation take?

There is no single answer, and anyone quoting one before a survey is guessing. The time on site depends on the size of the system and the roof; the time before that depends mostly on the grid application and any planning. In England, a council has 56 days to decide on prior approval for rooftop systems over 50 kW before the work can go ahead by default. Ask the installer for a programme with each step after the survey.

Will installing solar disrupt my business?

Usually less than people expect. Most of the work is on the roof, with scaffolding or edge protection and deliveries to plan around. The electrical connection needs a short shutdown of the circuits being connected, which can be scheduled outside working hours. Agree access, parking and any no-go areas before work starts.

What paperwork should I get when the system is finished?

For systems within the MCS standard (up to 50 kWp DC), a signed verification certificate with the test reports, the key components, the rated power and the estimated performance, and when the next inspection is due; confirmation that building regulations notification has been made; the network operator's connection paperwork; warranties and manuals; and the MCS certificate, which many incentives require.

How is a commercial installation different from a home one?

Mainly in the rules around it. A business commissioning the work is a commercial client under the construction safety regulations, with duties of its own. Most commercial systems need the network operator's approval before installation, rather than a notice afterwards. Systems over 50 kW in England need prior approval from the council, and larger systems fall outside the MCS standard, which covers up to 50 kWp.

Book a free site survey

Tell us about the business and the site. We'll call to go through the checks, then arrange the survey with one MCS certified installer.

  • Free to your business
  • No obligation
  • Your details go to one installer only
Book my free site survey

Free, no obligation

We match you with one of 130+ MCS certified installers across the UK, and only those who pass our checks.

Your sector

Solar for other kinds of business site, and our guides for business owners. Commercial solar for businesses

Guides for business owners